My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/12/1995
Ramsey
>
Public
>
Agendas
>
Council
>
1995
>
Agenda - Council - 12/12/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 3:49:55 PM
Creation date
9/26/2003 3:28:36 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/12/1995
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />,I <br /> I <br /> I <br /> I <br /> I <br /> l <br /> I <br /> I <br /> i <br /> I <br /> I <br /> I <br />'1 <br /> I <br /> I <br /> I <br /> I <br /> <br />CONSULTING ENGINEERING SERVICES <br /> 1996 CONSTRUCTION PROJECTS <br /> By: Steve Jankowski, City Engineer <br /> <br />FOR <br /> <br />CASE # <br /> <br />Background! <br /> <br />As budgets ar~ approved for 1996, we have a number of construction projects which must <br />be designed a0d completed as early as possible in 1996. To achieve th.is goal, the City <br />should select eind retain engineering consultants as soon as possible to allow for design, <br />permitting andlbidding at the earliest opportunity. Listed below are several projects which <br />are aniticpated:I <br />Wetland #114~ Mitigation for Filling Associated with Sunwood Drive <br />You will recallithat earlier this spring, the DNR had informed the City that it would allow <br />the filling of aiportion of Wetland #114P for the crossing of Sunwood Drive subject to <br />mitigation. 'fie are recently in receipt of a letter from DNR defining an acceptable <br />mitigation pr.oj~t which would consist of an earthen dike being placed across Wetland <br />#114 at two logafions; approximately 400 and 1,000 feet west of the current terminus of <br />Sunwood Driv'~e in Wood Pond Hills. Because Barbarossa & Sons is currently finishing <br />sanitary sewer ~nstallation within this wetland, the construction of such a berm could easily <br />be incorporated into their final restoration work within the wetland. John Oliver, Inc. has <br />been the engin~r involved on the school sewer and water extension project and would be <br />the logical ch~ce~ of engineers to design, stake and supervise construction of the mitigation <br />improvements.i In addition to the above, services require receiving necessary approval <br />from Anoka Qounty which has jurisdiction of County Ditch #43 which runs through <br />Wetland #114~. I anticipate having a proposal outlining the scope and cost of this work by <br />the time of the ineeting. <br /> <br />Extens~.on of Sunwood Drive from C.R. #56 to C.R. #116 and Sanitary Sewer and <br />Watermain to ~ervi~ AEC Energy Park ' <br /> <br />The City has nade a commitment to AEC' to service their new facility and adjoining <br />business park with sanitary sewer and water by the fall of 1996. The City selected <br />Hakanson Anderson Associates, Inc. to provide these services and due to the need for <br />service to sever al commercial development located along the proposed route to the business <br />park, a porfior of the sewer and water facilities were constructed in 1995. Because <br />Hakanson And~ :rson is under contract to complete the sewer and water mains to be routed <br />to AEC, they a~ the logical choice to complete the engineering of Sunw°od Drive, beneath <br />which these utilities will be placed. Additionally, Good Value Homes has purchased the <br />80-acre parcel ]lorth of AEC on C.R. gl 16 and will be developing a 160-lot subdivision. <br />They will be requesting the extension of sewer and water from the AEC Business Park. <br />The extension, f sewer and water to this site would be an efficient extension of the sewer <br />and water wor~ to be installed in Sunwood Drive. Attached to this case is a proposal from <br />Hakanson And~erson to do this work for a not-to-exceed cost of $24,800 for basic <br />engineering services and an estimated budget of $28,500 for surveying and inspection <br />services. The tbtal construction cost of these improvements is estimated to be as follows: <br /> <br /> Water, hain from Sunwood Drive to Good Value Inc. $ 70,750 <br /> Sani_._ta~?_ Sewer from Sunwood Drive to Good Value Inc. $140,000 <br /> Sunw .opd Drive C.R. #116 - C.R. #56 $300,000 <br /> Tat,al Construction Cost $510,750 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.