My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 01/12/1995
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
1995
>
Agenda - Parks and Recreation Commission - 01/12/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2025 12:26:26 PM
Creation date
9/29/2003 9:46:53 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
01/12/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F~b. ~, 1983 <br /> <br /> v. Class of 15edding for R.C. Pipe if other than <br />standard. <br /> <br /> vi. Any structure carrying a 500 cubic feet per <br />second or more design flood shall have the pertinent hy- <br />draulic data for the design flood shown in the plans. <br /> <br /> vii. Due to maintenance considerations the mini- <br />mum culvert size shall be 18 inch diameter. <br /> <br />BIKEWAYS <br /> -45- <br /> II I <br /> <br /> is not a participating item. Larger bicycle path pi }ect~ <br /> should be constructed by the contract letdnq process. <br /> Force account aqreements require the approval and ~ig. <br /> nature of the csty or county engineer, the district state <br /> aid engineer and the Director, Office of State Aid (the <br /> as plans). Submit three signed copies. Force account agree. <br /> ments must be approved prior to construction to be etiq~ble <br /> for funding. <br /> <br /> viii. Indicate the direction of flow of all drainage <br />with arrows. (This includes areas where there is natural <br />drainage and areas where drainage structures are not <br />required). <br /> <br /> j. Stationing of corporate limits of municipalities. <br /> <br /> k, Stationing of equations, exceptions and temporary <br />connections. <br /> <br />1. All section comers, land ties, etc. <br /> <br /> m. Grading quantities in agreement with those on <br />cro~s sections and statement of estimated quantities. <br /> <br /> n. Sources of selected material and locations of <br />designated borrow pits and balances showing where selected <br />material or borrow materials is to be placed. <br /> <br />G. SUMMARY <br /> <br /> Plans for b/cycle routes and bicycle lanes can be quite <br />brief. The geoqrapkic location of the project shall be <br />portrayed on the title sheet. Show a plat or plan view <br />clearly showing project route. Types and location of signs <br />shall be shown. Types of ~qns shall be referenced to the <br />applicable Standard Siqn Manual Sign Number. Striping <br />location, Wpes, quantities and details, if applicable, shall <br />be shown. A tabulation of estimate quantities shall be <br />included in the plans. <br /> <br /> Plans for bicycle paths shall show the proposed ali~n- <br />merit, grades, typical section and all other pertinent fea- <br />tures. These items shall be in accordance with the bikeway <br />engineerinq standards. <br /> <br /> o. All removal and construction items shall be shown <br />as notes or in tabulation form. (Culverts, storm sewer, <br />clearing and grubbing, sodding etc.). <br /> <br /> p. All construction items not covered by Mn/DOT <br />Standard Plates shall be detailed on appropriate plan sheets. <br /> <br /> q. A scale which will not require crowding of topo- <br />graphy and notes. <br /> <br />r. A "North" arrow on each plan and profile sheet. <br /> <br />E. CROSS-SECTION sheets are required for "Bicycle <br />Trail" projects as follows: <br /> <br /> 1..Cross culverts, cattle passes and subsurface drains. <br />Th_is (jives a better picture of the.planned drainage and pro- <br />rides an opportunity to check the structures for strength <br />classifica dons. <br /> <br />2. Side slope ratios and recovery area width. <br /> <br />F. FORCE ACCOUNT AGREEMENT PROJECT <br /> <br /> Smaller projects can be processed as Force Account <br />Agreement projects (see forms in State Aid Manual). This <br />eliminates the contract letting procedures. The paragraph <br />referring to PreLiminary Engineering shall be deleted as this <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> I <br />I <br /> <br />I <br />I <br /> <br />I <br />i <br />I <br />I <br />I <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.