My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 03/07/1995
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
1995
>
Agenda - Planning Commission - 03/07/1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2025 4:13:12 PM
Creation date
9/29/2003 11:20:44 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
03/07/1995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page Seven <br /> <br />THE ZONING REPORT <br /> <br />"A. The the .propert~. of the appellant of <br />which such map-street location forms a part <br />will not yield a reasor~able return to the owner <br />unless such permit be ~ranted, or <br />"B. That, balancing tha interest of the munici- <br /> .e integrity of the Of fi- <br /> est of the owner in the <br /> the property~ the grant <br /> lired by consideration of <br /> <br />pality in preserving tl <br />cial Map and the. inte: <br />use of the benefits o~ <br />of such permit is req, <br />justice' and equity. <br /> "Prior to any finding <br />the issuance of a pern <br />location, a public-heal <br />the event that the BZ. <br /> <br /> s of the BZA related to <br /> it wit.hin any ma.p street <br /> lng shall be held . . . In <br /> decides to authorize a <br />building permit~ it sha.[l have the power to spe- <br />cify [conditions of] t~e exact locationy ground <br />area~ height, and other details and conditions <br /> <br />of extent and charact <br />of the building, struc <br />be permitted." [Provo <br /> <br />[Key definitions relat <br />hillside zones]: <br /> <br />~r and also the duration <br />;ure~ or part thereof to <br />UT] <br /> <br />ad to buildable site for <br /> <br /> "Buildable area. Ther'buildable area' shall be <br />that portion of the pl~tted lot exclusive of the <br />required front, rear al d side yard setbacks, as <br />established by the ba.~e zone for the lot, and <br />all designated undevel(~pable area. <br /> '"Level building site.~ A 'level building site' <br />shall be a site cont~.ined wholly within the <br />Buildable Area, of a dimension not less than 30 <br />ft by 40 ft, to accon~modate the main struc- <br />ture1 required off-stre~et parking, and drainage <br />resulting from said imp~ ovements. Slope of the <br />Level Building Site sha~l not exceed 16%. <br /> "Transition slope. T~e 'transition slope' shall <br />be a slope contained ~holly within the Build- <br />able Area used to trar~sition from the grade of <br />the Level Building Sitq to the natural or engi- <br />neered finished grade ~f the yard area." <br />[Site Development Rqgulations, City of Salt <br />Lake City UT] <br /> <br />Siting/orientation for ~pecial design plans <br />"Flag lot: A lot behin~ a front'age lot, plus a <br />strip out to the street (pole) for an access <br /> <br /> · <br /> <br />drive. Creation of a flag lot shall be subject to <br />the following:. <br /> ".1 Buildings located on flag lots shall be <br /> <br />oriented to provide the maximum privacy to <br />surrounding existing and future residential <br />struc tur es; <br /> ".2 Access to all proposed flag lots . . . <br /> ".3 Landscaping and fencing (buffering)' as <br />required through Development Review to .insure <br />that privacy of existing residential structures <br />is maintained .... · <br /> ".6 The setback requ{rements of the primary <br />district shall be maintained unless modified <br />through [an administrative] Development Review <br />to provide more privacy to existing and pro- <br />posed struc'tures than if the required setbacks <br />were maintained, in order to implement [the <br />flag lot provision]; <br /> ".7 The minimum lot area requirements of the <br />primary district shall .be maintained; <br /> ".8 The pole or access portion of the flag lot <br />shall not be included in the calculation of the <br />minimum lot area; . . ." <br />[Washington Co, Hillsboro OR] <br /> <br />"1. Clustered Housing.' When residences are <br />clustered in design groups in a plat or PUD <br />with common open space, the clustered housing <br />may, in lieu of the zone regulations, be design- <br />ed with building locationsy lot sizes, yards and <br />/or density standards as prescribed on the plat <br />approved by the CPC, or on plans for the PUD <br />approved by the Zoning Board .... <br /> "4. [Zero lot line design]: Flexible Yards. <br />Yards may be reduced to zero provided the <br />structures are shown on the plat or PUD and a <br /> <br />10 ft access for maintenance is given by yard <br />and/or easement along each outside wall .... <br /> "6. Buyer Notification. The plat or PUD plan <br />shall note that the houses thereon are 'Innova- <br />tive Residential Development' [as authorized by <br />this section] and must be constructed as shown <br />on the plat or P'UD plan. Building permits shall <br />be issued only for structure types and place- <br />ments as shown on the plat or PUD. Sales <br />agreements and titles for land and residences <br />sold in Innovative Residential. Developments <br />shall note this restriction." [Spokane WA] <br /> <br />February 24, 1995 Issue <br /> <br />q~ <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.