Laserfiche WebLink
CC Regular Session <br />Meeting Date: 07/26/2011 <br />By: Tim Himmer, Engineering/Public <br />Works <br />Title: <br />Consider Acquisition of Drainage and Utility Easement at 16259 Coquina Street NW <br />Background: <br />During the process of gathering field information to implement the 2011 Street Maintenance Program (SMP), it <br />was discovered that an exiting storm sewer was discharging runoff from the right -of -way onto private property at <br />16259 Coquina Street NW. After researching the available information there doesn't appear to be an <br />existing drainage and utility easement over the pipes or encumbering the discharge /ponding area. Staff has met <br />with the property owners to discuss this matter on a few occasions. They were familiar with the existing storm <br />sewer condition that directed runoff onto their property, and haven't experienced any flooding concerns in the past. <br />They are open to a right of entry to perform the corrective work identified in the plans, but they want to understand <br />and investigate the option for a formal permanent drainage and utility easement. <br />Staff prepared an analysis of the easement area necessary to comply with ponding standards, which due to no outlet <br />location from the area (isolated basin), requires the storage of back -to -back 100 year rainfall events. Before <br />executing a right of entry the property owners are looking for feedback from the Council on advancing this <br />easement acquisition, and seeking clarification on potential terms and timing to complete. <br />This item was discussed in special session on July 19, 2011, and the consensus of the Council was to begin the <br />process of acquiring the necessary drainage and utility easement. It was discussed again earlier this evening in <br />work session, and a determination was made on a formal offer to the property owner. This case is to ratify the <br />decision made in work session this evening for the acquisition of the necessary easement at 16259 Coquina Street <br />NW. <br />Observations: <br />An easement, or right of entry, is necessary to complete the planned improvements for the overlay of Coquina <br />Street associated with the 2011 SMP. The adjacent intersection, at Coquina Street and Coquina Court, experiences <br />localized flooding and pavement deterioration (see attached map) because the outlet pipe that discharges onto the <br />property at 16259 Coquina Street NW is buried, and the catch basin and pipes in the street are full of water. Runoff <br />cannot get off the road and into the storm sewer because there are flat pavement grades and restricted flow in the <br />pipes. In order to correct the problem staff has prepared a design to install a concrete valley gutter through the <br />intersection, replace the existing deteriorated pipes and structures, and perform minor excavation and grading below <br />the outlet pipe for positive drainage. <br />Recommendation: <br />Staff recommends the ability to negotiate the acquisition of a drainage and utility easement that would encumber <br />the storm sewer system and ponding area located outside of the right -of -way on private property at 16259 Coquina <br />Street NW, in an amount determined by the City Council in work session earlier this evening. If it is determined <br />that the completion of this easement acquisition will extend beyond the timeline associated with the planned 2011 <br />SMP improvements staff would like to execute a right of entry agreement, such that the required storm sewer <br />improvements can be completed without affecting the rights of the property owner during the easement acquisition <br />process. <br />Funding Source: <br />Funding for the acquisition of this easement would be from the Storm Water Utility Fund. <br />7. 3. <br />