Laserfiche WebLink
Page 3 of 4 <br />SITE FURNISHINGS <br />58 <br />BENCHES- HESS AMERICA CC <br />EA <br />$4,368.00 <br />6 <br />$26,208.00 <br />6.00 <br />26,208.00 <br />6.00 <br />26,208.00 <br />PEDESTRIAN BRIDGE (281 <br />59 <br />28' PEDESTRIAN BRIDGE LUN <br />LS <br />$61,081.65 <br />1 <br />$61,081.65 <br />1.00 <br />61,081.65 <br />1.00 <br />61,081.65 <br />AMPHITHEATER <br />60 <br />AMPHITHEATER LUMP SUM <br />LS <br />$220,509.45 <br />1 <br />$220,509.45 <br />1.00 <br />220,509.46 <br />1.00 <br />220,509.46 <br />ALTERNATE K - OBSERVATION PLATFORM C <br />61 <br />ALTERNATE K LUMP SUM <br />LS <br />$34,000.00 <br />1 <br />$34,000.00 <br />1.00 <br />34,000.00 <br />1.00 <br />34,000.00 <br />ALTERNATE N - Well <br />62 <br />ALTERNATE N LUMP SUM <br />LS <br />$27,000.00 <br />1 <br />$27,000.00 <br />1.00 <br />27,000.00 <br />1.00 <br />27,000.00 <br />Change Order # 1 <br />Alternate I Observation Platform <br />LS <br />$11,790.75 <br />1 <br />$11,790.75 <br />1.00 <br />11,790.75 <br />1.00 <br />11,790.75 <br />Alternate J .Observation Platfom <br />LS <br />$50,413.00 <br />1 <br />$50,413.00 <br />1.00 <br />50,413.00 <br />1.00 <br />50,413.00 <br />Alternate L 60' Bridge <br />LS <br />$107,095.00 <br />1 <br />$107,095.00 <br />1.00 <br />107,095.00 <br />• 1.00 <br />107,095.00 <br />Misc. Changes <br />Redesigned Stage <br />LS <br />$19,710.90 <br />1 <br />$19,710.90 <br />1.00 <br />19,710.90 <br />1.00 <br />19,710.90 <br />Anderson Irrigation <br />LS <br />$3,691.60 <br />1 <br />$3,691.60 <br />1.00 <br />3,691.60 <br />1.00 <br />3,691.60 <br />Paint Finish <br />LS <br />$23,600.00 <br />1 <br />$23,600.00 <br />1.00 <br />23,600.00 <br />1.00 <br />23,600.00 <br />Site Fumishings <br />LS <br />"$752.06 <br />1 <br />$752.06 <br />1.00 <br />752.06 <br />1.00 <br />752.06 <br />C & L Excavating 4" Insulation <br />LS <br />$957.00 <br />1 <br />$957.00 <br />1.00 <br />957.00 <br />1.00 <br />957.00 <br />Tom Sauter Stairs Excavation <br />LS <br />$3,300.00 <br />1 <br />$3,300.00 <br />1.00 <br />3,300.00 <br />1.00 <br />3,300.00 <br />Bonus for Completion Date Met <br />LS <br />$10,000.00 <br />1 <br />$10,000.00 <br />1.00 <br />10,000.00 <br />1.00 <br />10,000.00 <br />WET LAND AREA SOIL CORRECTIONS <br />Platform C Soil Correction <br />LS <br />$2,100.00 <br />1 <br />$2,100.00 <br />1.00 <br />2,100.00 <br />1.00 <br />2,100.00 <br />Platform B Soil Correction <br />LS <br />$6,300.00 <br />1 <br />$6,300.00 <br />1.00 <br />6,300.00 <br />1.00 <br />6,300.00 <br />60' Bridge Soil Correction <br />LS <br />$21,857.33 <br />1 <br />$21,857.33 <br />1.00 <br />21,857.33 <br />1.00 <br />21,857.33 <br />Dewatering <br />LS <br />$21,785.40 <br />1 <br />$21,785.40 <br />1.00 <br />21,785.40 <br />1.00 <br />21,785.40 <br />Fuel and Maintenance <br />LS: <br />$2,173.50 <br />1 <br />$2,173.50 <br />1.00 <br />2,173.50 <br />1.00 <br />2,173.50 <br />Temp Road <br />LS <br />$3,150.00 <br />1 <br />$3,150.00 <br />1.00 <br />3,150.00 <br />1.00 <br />3,150.00 <br />Supervision <br />LS <br />$5,250.00 <br />1 <br />$5,250.00 <br />1.00 <br />5,250.00 <br />1.00 <br />5,250.00 <br />Page 3 of 4 <br />