Laserfiche WebLink
applicable to the processing of demolition concrete. The Permittee shall provide the City <br />of Ramsey with a copy of any permits or correspondence from any regulatory agencies <br />that are applicable to the processing of demolition concrete on the Site. The City shall <br />uphold the State standards by requiring testing upon the premise that an environmental <br />problem may exist. <br /> <br />Hours of material crushing shall be limited to 7:00 a.m. through 5:00 p.m. Monday <br />through Saturday. Any variance from these hours of operation shall require prior special <br />approval by the City Administrator or his/her designated representative. <br /> <br />7, <br /> <br />Crushing operations will be conducted a minimum of one time per year. A maximum of <br />two crushing periods are allowed per calendar year. Each crushing period shall not <br />exceed two (2) days in duration. Should either an emergency, equipment failure, <br />weather, or any other unforeseen event cause the crushing operation to cease, the <br />crushing operation shall not extend beyond the two (2) day period, except in accordance <br />with procedures as outlined in Condition Item #6. <br /> <br />8. The Permittee shall notify the City by letter at least one week prior to each crushing <br /> period. The notification shall indicate when crushing will begin. <br /> <br />Should a situation arise pertaining to noise, dust, or any other health, safety, or general <br />public welfare issues, the City may contact the MPCA or other qualified environmental <br />testing companies or agencies to investigate the situation. Ail testing will be at the <br />owner' s expense. <br /> <br />10. <br /> <br />Any permits issued by any other regulatory agencies are hereby incorporated by reference <br />into these conditions and made a part of this Conditional Use Permit as if fully set forth <br />herein. However, where the City and other jurisdictional standards conflict, the more <br />stringent standards shall apply. <br /> <br />Noise standards shall be the same as those set forth in the MPCA standards and, for any <br />regulated matters not covered in the MPCA standards, the League of Minnesota Cities <br />Model Noise Ordinance standards as established for 1990 shall apply. Dust shall be <br />controlled by the Permittee in the following manner: <br /> <br />A water truck will be stationed on the premises at all times. The Permittee shall <br />be responsible for wetting down the areas where the trucks are hauling material to <br />lessen the dust caused by the traffic. <br /> <br />The Permittee shall locate spray nozzles on the crusher. The water from these <br />spray nozzles will lessen the dust created when old concrete is reduced in the <br />crusher. The Permittee shall also install and use spray nozzles on any conveyors <br />to lessen the dust caused by the transportation of the finished product from the <br />crusher to the stockpile. <br /> <br />46 <br /> <br /> <br />