My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/02/2011 - Special
Ramsey
>
Public
>
Agendas
>
Council
>
2011
>
Agenda - Council - 08/02/2011 - Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:15:08 PM
Creation date
8/1/2011 12:25:43 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Title
Special
Document Date
08/02/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Development Plans. The PERMITTEE shall develop the Plat in accordance with the Final <br />Plat Plans and Final Site Plans as Follows along with requested revisions outlined in the City <br />Staff Review Letter dated January 20, 2011: <br />(the "Plans ") <br />Final Plat prepared by Bradley J. Canaday dated January 14, 2011 <br />Sheet A3 prepared by Architect Steve Erban dated January 11, 2011 <br />LI Sheet AS 1 prepared by Architect Steve Erban dated January 11, 2011 <br />j Sheet AS2 prepared by Architect Steve Erban dated January 11, 2011 <br />Li Sheet AS3 prepared by Architect Steve Erban dated January 11, 2011 <br />f Sheet AS4 prepared by Architect Steve Erban dated January 11, 2011 <br />g„) Sheet AS5 prepared by Architect Steve Erban dated January 11, 2011 <br />1) Sheet AS6 prepared by Architect Steve Erban dated January 11, 2011 <br />• Sheet C1 prepared by Lake and Land Surveying, Inc. dated January 10, 2011 <br />jj Sheet Cla prepared by Lake and Land Surveying, Inc. dated January 10, 2011 <br />• Sheet Clb prepared by Lake and Land Surveying, Inc. dated January 10, 2011 <br />The Plans shall not be attached to this Contract, but are in CITY files. <br />3. Stage I Improvements Required. The improvements the CITY requires that the <br />PERMITTEE construct within the Plat are as follows: <br />a. Stormwater management <br />b. Street upgrades and repairs <br />c. Natural gas line <br />d. Telephone service <br />e. Electric service <br />f. Temporary and permanent erosion control <br />("Stage I Improvements ") <br />The PERMITTEE agrees to construct the Stage I Improvements according to the terms and <br />conditions of this Contract and in accordance with the Plans. The Plans are subject to revisions <br />per City Staff Review Letter dated January 25, 2011. The final construction plan for the Stage I <br />Improvements shall be submitted to the City Engineer for review and approval prior to <br />commencement of construction. <br />The PERMITTEE agrees to provide specifications, subject to review and approval of the City <br />Engineer, for construction and restoration of utilities within the public right of way. Work must <br />be completed under traffic, be brought up to grade, and must be restored to existing conditions <br />within 24 hours. <br />The PERMITTEE shall be responsible for completing the rough grading and providing lot <br />corner stakes prior to the installation of underground utilities as set forth above. <br />Stage I Improvement Financial Guarantee. The PERMITTEE shall be responsible for a pre e <br />a- fmancial guarantee for the Stage I Improvements to ensure timely completion of the Stage I <br />Improvements. to the CITY guaranteeing the construction of the Stage I Improvements and their <br />Cross of Hope <br />Development AgreemeinContract <br />May, 2011 <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.