My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/09/2011
Ramsey
>
Public
>
Agendas
>
Council
>
2011
>
Agenda - Council - 08/09/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:15:43 PM
Creation date
8/4/2011 5:03:50 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/09/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 29, 2011 <br />To: <br />Aid Electric <br />Kevin Hackett <br />Ready Watt Electric <br />S & S Electric <br />Request for Proposal <br />763 571-4735 F <br />320 968-4496 F <br />763 241-5245 F <br />763 241-4089 F <br />The City of Ramsey is requesting proposals for installing electrical service cabinets in the park <br />located north of the Ramsey Municipal Center, 7550 Sunwood Drive. The service locations are <br />shown on the attached sketch. The purpose for this installation is to provide permanent power <br />for the annual Happy Days Celebration. The facility could also be used for other events <br />throughout the year. <br />Connexus Energy will install underground cable to the northeast corner of the site. The <br />application for service has been submitted by the City. The city is requesting a 320 amp service. <br />The work included in this proposal generally includes installation of the meter, installation of <br />600 feet of underground conduit with wire, installation of three (3) underground vaults and 3 <br />service panels mounted on a 4 x 4 post. <br />Each vault shall have a sleeve to accept and hold the 4 x 4 post vertical and damp proof <br />connectors for attaching the panel to the underground wire. Each vault shall also be provided <br />with 2 covers, one with an opening to accept the post and wire to the panel, the other shall be <br />solid. The covers must be lockable. The panel will be stored by the city and installed prior to <br />events in the park. <br />Each panel shall have a 200 amp main breaker, 8 20 amp single pole breakers, 2 50 amp 2 pole <br />breakers, 2 50 amp 125/ 250 V cam lock connections, and 8 20 amp GFI outlets with covers. <br />Please provide a cost to for installing all of the work as detailed and a cost for installing 2 panels <br />and 300 feet of conduit and wiring. The City Council has authorized up to $13,000 for this <br />project, including the service installation by Connexus Energy. <br />The work needs to be completed and operational by September 9, 2011. <br />Please submit your proposal by 10:00 am Monday August 8 to City of Ramsey, Attn: Leonard <br />Linton, Civil Engineer II. <br />
The URL can be used to link to this page
Your browser does not support the video tag.