Laserfiche WebLink
(i) Lawn requirements /ground cover. All exposed ground areas, including boulevards and <br />areas not devoted to off - street parking, driveways, sidewalks and/or trails, patios or other such <br />improvements shall be landscaped with grass, shrubs, trees and/or other ornamental landscape <br />materials within six (6) months of the date of issuance of the certificate of occupancy. Also refer <br />to individual zoning districts for specific planting requirements. <br />(1) Topsoil. In all zoning districts, a minimum of four (4) inches of topsoil, as defined in <br />Section 117 -1, shall be applied across all exposed ground areas to the edge of improved <br />streets, sidewalks, driveways and other impervious surfaces, excluding natural areas that <br />are left undisturbed, whenever a building permit is issued for the construction of a <br />principal building. <br />a. The depth of topsoil at the time of inspection shall be no less than four (4) inches. <br />b. Alternatives to the import of topsoil, such as compost or other soil amendments <br />known to improve soil water holding capacity may be permitted, but only with the <br />prior approval of the city engineer. <br />Section 117 -614 (j) (10) a. is hereby amended to read as follows: <br />a. Provide finish grading and turf establishment for all park, playground, trail and public <br />open spaces and provide landscape screening in accordance with City Policy. Except <br />for natural areas that are left undisturbed and areas improved with buildings or <br />paving, all areas reserved for dedicated parkland shall include at least four (4) inches <br />of topsoil, as defined in section 117 -1, or an approved alternative as referenced in <br />section 117 -348. <br />Section 117 -615 (c) (8) is hereby amended to read as follows: <br />(8) Lot grading. All lots shall be graded in accordance with the final grading plan. In <br />addition, erosion control measures shall be followed to eliminate erosion. Upon <br />completion of the grading, at least four (4) inches of topsoil, as defined in section <br />117 -1, or an approved alternative as referenced in section 117 -348, shall be applied to <br />all exposed ground areas. And said areas shall be landscaped in accordance with the <br />final landscape plan <br />Section 117 -615 (c) (14) is hereby amended to read as follows: <br />(14) Boulevard sodding. This item shall be completed just prior to occupancy of the <br />building. This item may be completed sooner provided the subdivider maintains the <br />sod until the dwelling or structure is occupied. Boulevard sod shall be installed over <br />at least four (4) inches of topsoil, as defined in section 117 -1, or an approved <br />alternative as referenced in section 117 -348. <br />