Laserfiche WebLink
Scenario 4: Industrial Development, Section B: Water Trunk <br />City: <br />Blaine <br />Coon Rapt • s <br />Dayton <br />Medina <br />Elk River <br />Cambridge <br />Big Lake <br />St. Francis <br />Prior Lake <br />Monticello <br />Ramsey <br />25000 <br />20000 <br />15000 <br />10000 <br />5000 <br />0 <br />Section B: <br />NO ANSWER <br />Assessed based on actual construction. Deferral based on actual construction. (cost applied elsewhere) <br />$5,510 per acre <br />NO ANSWER <br />NO ANSWER <br />NO ANSWER <br />$0 per acre if contained on site <br />NO ANSWER <br />$5,780 per acre <br />$3,245 /acre* <br />NO ANSWER <br />$22,040 <br />Storm Water Trunk <br />$23, <br />a\ �a a ` a5 o 'c a\ca •.‘ � `a % o � �G�� ��e ` ��o ya J <br />Appendix 95 1 P a g e <br />