Laserfiche WebLink
Scenario 4: Industrial Development, Section B: Street Lights <br />City: <br />Blaine <br />Coon Rapt • s <br />Dayton <br />Medina <br />Elk River <br />Cambridge <br />Big Lake <br />St. Francis <br />Prior Lake <br />Monticello <br />Ramsey <br />4000 <br />3500 <br />3000 <br />2500 <br />2000 <br />1500 <br />1000 <br />500 <br />0 <br />Section B: <br />Developer installed. <br />NO ANSWER <br />NO ANSWER <br />2982 <br />$200 <br />$0 <br />Installed by developer <br />Installed by developer <br />NO ANSWER <br />$1,700 per light = $3,400 <br />Street Lights <br />$2,982 <br />$200 <br />$3,400 <br />C�oo F� � a � ��. Q �• <br />Appendix 101 1 P a g e <br />