Laserfiche WebLink
Scenario 4: Industrial Development, Section D: Water Meter /Horn <br />City: <br />Blaine <br />Coon Rapt • s <br />Dayton <br />Medina <br />Elk River <br />Cambridge <br />Big Lake <br />St. Francis <br />Prior Lake <br />Monticello <br />Ramsey <br />1400 <br />1200 <br />1000 <br />800 <br />600 <br />400 <br />200 <br />0 <br />Section D: <br />NO ANSWER <br />$1,000 <br />$450 <br />$125 for transmitter, developer buy meter /horn <br />570/ 860 for irrigation <br />NO ANSWER <br />Water meter furnished by plumber <br />NO ANSWER <br />NO ANSWER <br />$1200 + tax <br />TBD (will send in an updated version) <br />$1,000.00 <br />$450.00 <br />Water Meter /Horn <br />$570.00 <br />1 <br />$1,200.00 <br />��dy , a\ �. a \ ye t \b% s <br />� a � e c e, <br />�a�� G a a <br />� o o �a Q aJ � �\� � �\� � <<ta Q` \o � <br />L <br />Appendix 117 1 Page <br />