Laserfiche WebLink
Utility /Entitlement Fees, Engineering Inspection Fees: Gross /Net Charges <br />City: <br />laine <br />oon <br />apids <br />ayton <br />edina <br />Ik River <br />ambridge <br />ig Lake <br />t. Francis <br />rior Lake <br />onticello <br />amsey <br />Engineering Inspection Fees: <br />Most costs are on an upland basis (wetlands out, ponding in- -which could be wetland) <br />Front Footage on a Net Basis <br />Gross <br />Net acres (storm water utility). <br />We do not charge development fees on a per acre basis. <br />Fees are charged based on total acreage less wetlands and floodplain. <br />Net acreage based on Final Plat usable developable area. <br />Net <br />Net Acreage <br />Trunk area charges for water and sewer are paid on gross acreage, storm water is net <br />We charge based on gross (the total amount of land that project takes place). We do not charge <br />based only on usable land. <br />3 <br />Gross /Net Charges <br />• Gross <br />▪ Net <br />Both <br />Neither <br />Appendix 131 1 P a g e <br />