My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 08/23/2011
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2011
>
Agenda - Council Work Session - 08/23/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:16:41 PM
Creation date
8/18/2011 5:16:57 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
08/23/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Appendix B: Individual Questions /Answers <br />Results for the development costs survey are broken down into five separate scenarios: <br />Within each scenario are four sections of answers (Section B -D). Each individual answer for the <br />development costs study occupies one page. On the page will be a both a graphic and verbal display of <br />answers. The verbal display depicts the actual answer received. <br />When reviewing the results of this survey please consider the following: <br />• When cities rely on the developer to install (DI) needed public infrastructure; or, when a city <br />assesses (ASSD) the cost of public infrastructure to future property owners those nominal costs <br />are not reflected in this survey. The actual nominal cost of development (for a developer) would <br />be greater than stated. <br />• Leaving an answer space blank, writing "zero," writing the word "nothing," writing an answer <br />that doesn't apply and not having a fee /cost are all considered the same answer (zero /NA). <br />• People interpret identical questions differently; and, people answer identical questions <br />differently (i.e. including a partial answer or common answer rather than a factual answer). <br />• Cities may have not fully completed the survey; or, did not add in their unique development <br />costs in which the survey failed to address. <br />• Categories of costs were left out: fire suppression costs, irrigation requirements and several <br />other development costs were not included in the survey. <br />Appendix 3 I P a g e <br />
The URL can be used to link to this page
Your browser does not support the video tag.