Laserfiche WebLink
$18,000 <br />$12,000 <br />$12,000 <br />$9 <br />$7,800 <br />$7,620 <br />$6,000 $6,000 <br />■ <br />— <br />$4,200 <br />■ ■ ■ <br />■ <br />$3,060 <br />Scenario 1: Single Family Home, Section D: City Sewer Connection (Permit) <br />Section ®` <br />Cit <br />Blaine <br />Coon Rapids <br />Dayton <br />Medina <br />Elk River <br />Cambridge <br />Big Lake <br />St. Francis <br />Prior Lake <br />Monticello <br />Ramsey <br />ity Sewer Connection (permit) <br />20000 <br />18000 <br />16000 <br />14000 <br />12000 <br />10000 <br />8000 <br />6000 <br />4000 <br />2000 <br />0 <br />NO ANSWER <br />$100 per unit <br />$150 each <br />$100 per unit <br />65 +2000 bond (includes water connection permit) <br />$50.00 <br />35 <br />$50 <br />$25.50 <br />$127.00 (for both: water & sewer) per unit (split for survey) <br />$75 per unit = $9,000 <br />City Sewer Connection (Permit) <br />Q, boo O �Z � � . � ��a Q�\ � • <br />Appendix 251 Page <br />