Laserfiche WebLink
Scenario 1: Single Family Home, Section D: Plumbing Permit <br />City: <br />Blaine <br />Coon <br />Rapids <br />Dayton <br />Medina <br />Elk River <br />Cambridge <br />Big Lake <br />St. Francis <br />Prior Lake <br />Monticello <br />Ramsey <br />Plumbing Permit <br />30000 <br />25000 <br />20000 - <br />15000 <br />10000 <br />5000 <br />$149.50 <br />0 <br />$200 per unit <br />$139.50 per unit <br />$200 each <br />$10 per plumbing fixture (assumed 22 per unit, 2640 total) <br />1.5% of plumbing value <br />$150 per dwelling <br />85 <br />$50 minimum (per unit) <br />$45.00 + $9.00 /fixture <br />$200 per unit = $24,000 <br />$26,400 <br />$24,000 _$24,0 • <br />$16,740 <br />Plumbing Permit <br />8,000 $1 /,94u <br />$10,200 $10,200 <br />$24,000 <br />e ..c• J�o� \ �a `�� \a le �a �` �� �a�� ` �� �o y �J <br />boo pa 4e. <"t_ _ � pc � ��a `o t �� 1 <br />Appendix 32 1 P a g e <br />