Laserfiche WebLink
Scenario 2: Townhomes, Section D: City Sewer Connection (permit) <br />City: <br />Blaine <br />Coon Rapids <br />Dayton <br />Medina <br />Elk River <br />Cambridge <br />Big Lake <br />St. Francis <br />Prior Lake <br />Monticello <br />Ramsey <br />City Sewer Connection (permit) <br />1400 <br />1200 <br />1000 <br />800 <br />600 <br />400 <br />200 <br />NO ANSWER <br />$100 per unit <br />$150 each <br />$100 per unit <br />65 + 2000 bond (includes water connection permit) <br />$50 <br />35 <br />$50 <br />25.5 <br />\a . <br />$127.00 (for both: water & sewer) per unit (split for survey) <br />$75 per unit = $600 <br />City Sewer Connection (Permit) <br />$1,200 <br />$800 <br />i <br />$400 <br />1 <br />$280 <br />1 <br />508 <br />$400 <br />$204 <br />$600 <br />¢ a � _ t \,a a � \ a >(' � 5 <br />Appendix 551 Page <br />