Laserfiche WebLink
Project: Riverdale Drive <br />Project Location: <br />Improvements <br />Ramsey, MN <br />ITEM NUMBER <br />Description <br />Unit <br />UNIT PRICE <br />Project <br />Total <br />ESTIMATED <br />QUANTITY <br />ESTIMATED COST <br />2021.501 <br />MOBILIZATION <br />LUMP SUM <br />$30,000.00 <br />1 <br />$30,000.00 <br />2101.501 <br />CLEARING <br />ACRE <br />$1,500.00 <br />0.4 <br />$600.00 <br />2101.502 <br />CLEARING <br />TREE <br />$100.00 <br />15 <br />$1,500.00 <br />2101.506 <br />GRUBBING <br />ACRE <br />$1,500.00 <br />0.4 <br />$600.00 <br />2101.507 <br />GRUBBING <br />TREE <br />$30.00 <br />15 <br />$450.00 <br />2104.509 <br />REMOVE BITUMINOUS PAVEMENT <br />SQ YD <br />$2.50 <br />5261 <br />$13,152.50 <br />2104.509 <br />REMOVE SIGN TYPE C <br />EACH <br />$50.00 <br />15 <br />$750.00 <br />2104.513 <br />SAWING BIT PAVEMENT (FULL DEPTH) <br />LIN FT <br />$3.10 <br />3265 <br />$10,121.50 <br />2105.501 <br />COMMON EXCAVATION (P) <br />CU YD <br />$7.00 <br />7100 <br />$49,700.00 <br />2105.507 <br />SUBGRADE EXCAVATION (P) <br />CU YD <br />$7.00 <br />11220 <br />$78,540.00 <br />2105.522 <br />SELECT GRANULAR BORROW (CV) (P) <br />CU YD <br />$12.00 <br />11220 <br />$134,640.00 <br />2105.525 <br />TOPSOIL BORROW (LV) (P) <br />CU YD <br />$12.00 <br />2455 <br />$29,460.00 <br />2211.503 <br />AGGREGATE BASE (CV) CLASS 5 <br />CU YD <br />$21.00 <br />3265 <br />$68,565.00 <br />2360.501 <br />TYPE SP 12.5 WEARING COURSE MIX (3, C) <br />TON <br />$60.00 <br />2613 <br />$156,780.00 <br />2360.502 <br />TYPE SP 12.5 NON WEAR COURSE MIX (3, B) <br />TON <br />$56.00 <br />2061 <br />$115,416.00 <br />STORM SEWER SYSTEM <br />LUMP SUM <br />$120,000.00 <br />1 <br />$120,000.00 <br />2531.501 <br />CONCRETE CURB & GUTTER DESIGN B618 <br />LI3 =I <br />$11.00 <br />5400 <br />$59,400.00 <br />2533.507 <br />PORTABLE PRECAST CONC BARRIER DES 8337 <br />LIN FT <br />$15.00 <br />2770 <br />$41,550.00 <br />2533.508 <br />RELOCATE PORT PRECAST CONC BAR DES 8337 <br />LIN FT <br />$4.00 <br />380 <br />$1,520.00 <br />2554.509 <br />GUIDE POST TYPE B <br />EACH <br />$50.00 <br />, <br />$250.00 <br />2554.615 <br />IMPACT ATTENUATOR <br />AMBY <br />$2,600.00 <br />2 <br />$5,200.00 <br />2554.615 <br />RELOCATE IMPACT ATTENUATOR <br />AMBY <br />$600.00 <br />I <br />$600.00 <br />2563.601 <br />TRAFFIC CONTROL <br />LUMP SUM <br />$50,000.00 <br />1 <br />$50,000.00 <br />2563.602 <br />MEDIAN BARRIER DELINEATOR <br />EACH <br />$7.50 <br />92 <br />$692.50 <br />2564.531 <br />SIGN PANELS TYPE C <br />SQ FT <br />$33.00 <br />136.0 <br />4488.0 <br />2573.502 <br />SILT FENCE TYPE MACHINE SLICED <br />LIN FT <br />$2.00 <br />7710 <br />$15,420.00 <br />2575.501 <br />SEEDING <br />ACRE <br />$200.00 <br />2.5 <br />$500.00 <br />2575.502 <br />SEED MIXTURE 240 <br />POUND <br />$3.00 <br />188 <br />$562.50 <br />2575.523 <br />EROSION CONTROL BLANKETS CATEGORY 1 <br />SQ YD <br />$1.20 <br />12100 <br />$14,520.00 <br />2575.532 <br />FERTILIZER TYPE 2 <br />POUND <br />$1.00 <br />500 <br />$500.00 <br />2575.571 <br />RAPID STABILIZATION METHOD 3 <br />M GALLONS <br />$260.00 <br />15.0 <br />$3,900.00 <br />2582.501 <br />PVT MSSG (LT ARROW) EPDXY <br />EACH <br />$450.00 <br />2 <br />$900.00 <br />2582.501 <br />PVT MSSG (RI ARROW) EPDXY <br />EACH <br />$450.00 <br />2 <br />$900.00 <br />2582.502 <br />4" SOLID LINE WHITE - EPDXY <br />LIN FT <br />$0.50 <br />8640 <br />$4,320.00 <br />2582.502 <br />24" STOP LINE WHITE - EPDXY <br />LIN FT <br />$3.00 <br />20 <br />$60.00 <br />2582.502 <br />4" DOUBLE SOLID LINE YELLOW - EPDXY <br />LIN FT <br />$1.00 <br />2520 <br />$2,520.00 <br />ROADWAY SUBTOTAL <br />$1,018,078.00 <br />20% CONTINGENCY <br />$203,615.60 <br />PROJECT TOTAL I <br />$1,221,693.60 <br />