Laserfiche WebLink
grounds for denial of a building permit for any portion of the Property still owned <br />by PERMITTEE. <br />q. Contract Binding On Successors and Assigns. This Contract shall be binding <br />upon the parties, and their respective successors and assigns. <br />r. Letters of Credit. All letters of credit presented as a financial guarantee, if <br />required prior to issuance of a Certificate of Occupancy, shall be first approved as <br />to form and content prior to acceptance by the CITY. <br />18. Requirements for Building Permit and Certificate of Occupancy. <br />a. No building permit for any lot in the Plat shall be issued until: (a) a Class 5 <br />driving surface is installed to within 300 feet of the proposed structure; (b) a <br />Certificate of Survey, including the survey information required by the CITY, has <br />been supplied to the CITY Building Official; (c) all the financial guarantees <br />required by the CITY have been satisfied; (d) a permit from the Lower Rum <br />River Watershed Management Organization has been obtained; (e) a permit from <br />Anoka County Soil Conservation District has been obtained (if necessary); and (f) <br />this Contract has been signed and received by the CITY. <br />b. No Certificate of Occupancy for any lot in the Plat shall be issued until: (a) <br />vehicular access to the lot is provided, including installation of at least one layer <br />of bituminous surfacing; (b) all utilities are in place, operational and accepted by <br />the CITY in accordance with this Agreement; (c) for lots that have a slope of less <br />than 2%, a certificate of grading, prepared by a licensed (State of Minnesota) <br />professional land surveyor, is provided to the CITY documenting that the flattest <br />grade on the lot is 1 % or greater; and (d) boulevard sod and landscape tree, or <br />escrow for same, have been provided. <br />c. All improvements included in the Permittee Plans, including amendment required <br />of the City Staff Review Letter dated June 29, 2011, revised August 3, 2011 are <br />completed, or financial guarantee in the amount of 125% the City Engineer's <br />estimate of the cost of said improvements is secured in the form of cash escrow or <br />letter of credit for the parking lot and related items. <br />19. Park Dedication. The Plat is located in the CITY's Prairie District. The current park <br />dedication requirement for assisted living complexes is $4,738 per acre. The amount due <br />for the Plat is Thirty One Thousand Forty Three Dollars and No Cents ($4,735 x 6.55 <br />acres = $30,778.00). The rate in effect the time this Contract is executed shall be <br />collected. <br />20. Trail Development Fees. The current trail development fee is $600 per dwelling unit. <br />The amount due for the Plat is Forty Three Thousand Two Hundred Dollars and No <br />Cents ($600 x 33 units = $19,800.00). PERMITTEE is constructing trail improvements <br />to connect the existing trail along Nowthen Boulevard through Lot 1. These <br />improvements located on the remaining parcels to be consolidated into the existing parcel <br />STONEY RIVER <br />Development Agreement <br />Page 7 of 12 <br />