My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/23/2011
Ramsey
>
Public
>
Agendas
>
Council
>
2011
>
Agenda - Council - 08/23/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:16:21 PM
Creation date
8/19/2011 8:57:50 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/23/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review File: Stoney River <br />Sketch Plan and Site Plan Review <br />June 30, 2011, Revised August 17, 2011 <br />Page 10 of 11 <br />Site Access: The required fire department access road shall be a minimum unobstructed 20 ft. in width <br />and 13 ft. 6 in. clear height and shall be designed to support an apparatus with a gross axle weight of <br />75,000 lbs. The turning radius for emergency apparatus roads is 30 ft inside and 50 ft outside radius or as <br />approved by the code official. The proposed building is required to have an emergency vehicle access <br />road within 150 ft of any exterior portion of the structure. Please add these notes to the applicable sheets. <br />Site Water: The required spacing between fire hydrants is 400 ft. A fire flow test is required to verify <br />fire flow requirement is available. All water mains and hydrants shall be installed and operate as soon as <br />combustible materials arrive on construction site. Please add these notes to the applicable sheets. <br />DEVELOPMENT FEES <br />Please note that the City is willing to consider utilizing the SAC Unit Determination as the number of <br />unit calculation for the following fees. It shall be the responsibility of the developer to provide the City <br />with the SAC Determination, processed by the Metropolitan Council. A preliminary SAC Analysis has <br />been completed with a SAC Unit Determination of 33 units. <br />Park Dedication. The 2011 Park Dedication Fee for assisted living complexes is $4,738 per acre. This <br />equates to $30,778.00 (6.55 acres x $4,735). The rate in effect at the time the Plat is recorded will be <br />collected. <br />Trail Development Fees: The 2011 Trail Development Fee is $600 per unit. This equates to $19,800.00 <br />(33 units x $600). The rate in effect at the time the Plat is recorded will be collected. A portion of the <br />trail fees may be credited back to the applicant if they construct off -site trail connections as part of this <br />application. <br />Sanitary Sewer Trunk/Connection. The 2011 Sanitary Sewer Trunk Fee is $1,318 per unit. This <br />equates to $43,594.00 (33 units x $1,318). The rate in effect at the time the Plat is recorded will be <br />collected. <br />Water Trunk/Connection. The 2011 Water Trunk Fee is $2,308 per unit. This equates to $76,164.00 <br />(33 units x $2,308). The rate in effect at the time the Plat is recorded will be collected. <br />Sanitary Sewer Lateral Benefit. The 2011 Sanitary Sewer Lateral Benefit Fee is $3,989 per connection. <br />This equates to $3,989.00 (One [1] connection x $3,989). The rate in effect at the time the Plat is <br />recorded will be collected. If the cost to extend service to the proposed building exceeds the cost of the <br />lateral benefit fee, the City will consider a credit to this fee. <br />Water Lateral Benefit. The 2011 Water Lateral Benefit Fee is $9,102 per connection. This equates to <br />$9,102.00 (One [1] connection x $9,102). The rate in effect at the time the Plat is recorded will be <br />collected. If the cost to extend service to the proposed building exceeds the cost of the lateral benefit fee, <br />the City will consider a credit to this fee. <br />Stormwater Management. The 2011 Stormwater Management Fee is $465 per unit. This equates to <br />$15,345.00 (33 units x $465). The rate in effect at the time the Plat is recorded will be collected. <br />
The URL can be used to link to this page
Your browser does not support the video tag.