Laserfiche WebLink
STREET PAVING PROGRAM <br />By: City Engineer Steve Jankowski <br /> <br />Case # <br /> <br />Background: <br /> <br />In 1993 it was dflermined that the City should pursue a program of paving its remaining dirt and <br />gravel s~eets. The 1994 budget contains $20,000 toward the unplementauon of this program. <br /> <br />As you will recall¢, during thc discussion of the Bison Slreet N.W. paving this past summer, one of <br />the major obstacl~:s to realizing the paving of the remaining din streets was attributed to the high <br />individual assessments associated with these projects. The Council determined that it may wish to <br />subsidize paving ?rojects to some level in order to eliminate this concern. The first order of <br />business toward ~ stablishing this program is to determine the appropriate level of subsidy. In <br />order to assist in tJ ~is task, I have prepared a map (not enclosed but available at the meeting) (vhich <br />identifies all of th remaining dirt and gravel streets. Attached is a list of street paving projects <br />which identifies a Id describes 14 candidate projects targeted for paving under this program. It <br />should be noted, t] ~at several dirt roadways which are maintained by the City are not included on <br />that list. These ex':eptions include three roadways which service only one property. In addition <br />several sections of flirt street which are close to existing sewer and water have also been eliminated <br />from the program finee these streets have a high probability of being serviced with sewer and <br />water prior to the paving program ending in 1997. <br /> <br />Attached is an exhi ,bit entitled Financial Analysis of Street Paving Program. This table contains the <br />number of benefitt.~e.d properties which will be served by each project, the estimated total project <br />cost and the individhal unit cost per benefitted property. Also contained on this table is the project <br />subsidy which will~ be required if various assessment caps are instituted. Depending upon the <br />assessment cap selected by the Council the excess unit cost above this level would be borne out of <br />the street paving program account and would result in the necessary project subsidy identified on <br />the table. The table, has been prepared showing assessment.caps in increments of $500 ranging <br />between $3,000 anti $4,500 for purposes of illustrating the magnitude of the entire program <br />subsidy, however, my assessment cap level may be selected. <br /> <br />Also attached is a table entitled History of Street Paving Projects Since 1980. The purpose of this <br />exhibit is to provide ':the Committee with information on the level of individual assessments which <br />have been made on tifevious street paving projects in order to determine an appropriate assessment <br />cap for the proposed paving program. As you can see, individual assessments on various street <br />paving projects have, ranged from $1,563 to $4,181. The far left column of this table contains the <br />assessment unit pric{ adjusted to reflect 1993 costs. You will also note that since 1980 over 500 <br />properties have been :~assessed for street paving improvements and the average assessment in 1993 <br />dollars has been slig}~fly over $4,100. Whatever assessment cap is selected should be indexed to <br />the construction cost ~dex so that it can be adjusted annually for inflation. <br /> <br />Finally, I have prepared an exhibit entitled Proposed Paving Schedule. This schedule seeks to <br />address projects whic~h have the greatest number of parcels as a priority while still seeking to stay <br />within the $20,000 p~r year subsidy budgeted for this program in 1994. The attached schedule <br />shows the proposed ~rogram could be accomplished within four years with a $20,000 annual <br />budget at a subsidy ca~0 level at $4,000. <br /> <br /> <br />