Laserfiche WebLink
Messages for Sylvia Frolik <br />Wednesday, December 8, 1993 4:06 PM <br /> <br />Page I <br /> <br />Date: Wed, Dec 8, 1993 at 3:56 PM <br />From: Sylvia Frolik <br />Re: Danny's Tranny's <br />To: Sylvia Frolik@Mail Box <br /> <br />On December 6, 1993, I did a drive by inspection to determine condition of premises at the proposed site for <br />Danny's Tranny's (L~ts 2, 3 and 4 of Block 4, Gateway North Industrial Park Plat 2 and for the existing <br />Dannfs Aluminum site on Lot 1, Block 4, Gateway North Industrial Park Plat 2. Since my inspections in <br />October and November, it is apparent that Mr. Karst has been working to clean up Lots 2, 3 and 4. However, <br />some outside storage of debris and inoperable equipment continues on the property. I also observed <br />employees preparing feedstock with cutting tomhes on the site. As for Lot 1, the fence screening rerrm/ns in <br />unacceptable condition, a lugger of materia_ls being stored outside the fenced area appeared to be very close to, <br />if not in the road right-of-way. Operations have expanded beyond the iirmts of LOt 1 and that explains <br />operations going onto Lots 2, 3 and 4 prior to the construction of the building. <br /> <br /> <br />