My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/08/1994
Ramsey
>
Public
>
Agendas
>
Council
>
1994
>
Agenda - Council - 02/08/1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 4:06:26 PM
Creation date
10/10/2003 3:33:06 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/08/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10. <br /> <br />II. <br /> <br />12. <br /> <br />13. <br /> <br />Drainage Plan <br /> <br />Drainage from the facility and associated paved roadways, storage areas and <br />parking areas will be directed to a sedimentation basin. This basin is located 150 <br />feet North of Ire facility. This is an existing basin which is adequate to support the <br />proposed demonstration. <br /> <br />Access to Site <br /> <br />Acces~ to the demonstration facility will be off Sunfish Lake Boulevard using the <br />existigg entrance to the Anoka Regional Landfill. <br /> <br />Garbage Container Location <br /> <br />A garl:~age container will be located in the proposed facility and screened from all <br />outsidi viewing, The contents will be limited to paper material only. <br /> <br />Description of Construction and Proposed Materials <br /> <br />The demonstration facility will be a pre-engineered wood facility (60'x 140' x 18') <br />placed ~On the space provided by Waste Management Inc. The facility will include <br />one 481 wide x 18' higJa Bi-fold door; one 20' wide x 16' high steel frame end <br />door; ~t$vo 3068 Service doors; ten 3' x 7' Skylights for natural light and installed <br />with sc~'ew/bott fastener system. Kaltec will be responsible for the installation and <br />remove, of the building after completion of the project. A preliminary layout of <br />the proposed facility is included in Attachment 2. ~ <br /> <br />Neighborhood Meeting <br /> <br />DiscusSions regarding the proposed demonstration have been conducted with <br />Ms. Sh~on Daht_m-en. There is no planned formal neighborhood meeting planned <br />due to t~e temporary nature of this project. <br /> <br />Effects of Proposal on traffic in Area <br /> <br />The op~ation of the demonstration facility will have minimal effect on traffic in the <br />area. The entrance to the facility will be the existing entrance for the Anoka <br />Re~on~ Landfill, The initial installation of the facility will require approximately <br />ten truclks to be off-loaded. This number of trucks would be required during the <br />disassen)bly process after completion of the demon~ration, The normal operation <br />w':.r~ld bk limited to supply services, operating personnel and visitors. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.