My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/14/2003
Ramsey
>
Public
>
Agendas
>
Council
>
2003
>
Agenda - Council - 10/14/2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 3:55:26 PM
Creation date
10/13/2003 7:48:05 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/14/2003
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
346
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. That the Applicant has stated that the demolition concrete will be confined to a 70' x 120' <br /> area, surfaced with recycled aggregate and that the stockpile will not exceed l0 feet in <br /> height. <br /> <br />13. That the Applicant has stated that a crusher will be brought onto the site once a year for a <br /> two day period to crush the concrete into a sub-base that will be used on project sites. <br /> <br />14. That the Applicant has stated that if necessary, water will be used for dust control during <br /> the crushing operations. <br /> <br />15. That the storage area is unsightly and the site plan submitted with the application does <br /> not identify any screening of the concrete stockpile area; however, the Applicant has <br /> stated a willingness to construct a non-landscaped earth berm for screening purposes. <br /> <br />t6. That the City has recently expended approximately $2,318,000.00 to date for land <br /> acquisition, public improvements, site improvements and demolition costs to eliminate <br /> blighted conditions in the area and develop Gateway North Industrial Park NO. 5. <br /> <br />17. That properties to the northwest and to the east have recently been sold for <br /> redevelopment to private entities. <br /> <br />18. That there is one other facility in Ramsey that received a conditional use permit to <br /> process demolition concrete into a reusable, for-sale product. <br /> <br />19. That the proposed use will substantially increase traffic to and from the area. <br /> <br />20. That the proposed use will be unduly dangerous or otherwise detrimental to persons <br /> working in the vicinity of the use, or to the public welfare. <br /> <br />21. That the proposed use will not be harmonious with and in accordance with the specific <br /> objectives of the Comprehensive Plan. <br /> <br />22. That the proposed use will not be designed, operated and maintained so as to be <br /> hanrtonioUs and appropriate in appearance with the existing character of the general <br /> vicinity and such use will change the essential character of the area. <br /> <br />23. That the proposed use will not be a substantial improvement to the property in the <br /> immediate vicinity and to the community as a whole. <br /> <br />24. That the proposed use will be served adequately by essential public facilities and <br /> services, such as highways, streets, police and fire protection. <br /> <br />25. That the proposed use will create excessive additional requirements at public cost for <br /> public facilities and services and it will be detrimental to the economic welfare of the <br /> cormnunity. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.