My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/22/1994
Ramsey
>
Public
>
Agendas
>
Council
>
1994
>
Agenda - Council - 03/22/1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 4:07:12 PM
Creation date
10/13/2003 10:52:00 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/22/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12. <br /> <br />~v <br /> <br />[te Pl~un Development Permit will require a maintenance guarantee to ensure thc <br />~1 of the plantinss for a 2 year Period. <br /> <br /> The plan proposed convca'fing 1.05 am'cs of thc 1.15 acre sim to an impermeable <br />T~c n:~jofity of the ~it~ da'a~ge is !m-opos, c,d to be ~ to the west ~r'bline of <br /> <br />.Ebony Strict via three paved flumes. The storm sewer m Ebony Street in turn conveys the <br />runoff, to the Mississipi Pdvcr. <br /> <br />The westernmost 32 feet of pavement is directed to drain westbound toward the property <br />hnc of. the City park. <br /> <br />Draim ge is a major concm"n on this site plan from two separate criteria; water quality <br />stunt2 ~is set by the local warn- munagement orguni~-ation and thc capacity of thc existing <br />storm ~,ater system to handle thc volume of runoff generated. <br /> <br /> The l~,ower Rum River Water Management Organization (LRRWMO) requires <br /> . ime[nmrion prior to discharge into a Class A warm-body which is the classification of the <br /> sSisgppi River. <br /> <br />In addition to the drainage requirements of the WMO, the adeqnasy of the existing storm <br />sewer ~ervicing the propc:rty must be considcre& The commercial area served by the ,storm <br />sewer ~o which thc proposed development would discharge includes approximatel) 9.25 <br />am-es. ?his includes the land uses south of I-:t/ghway #10 between Fekispm- and Dolomite <br />Street.[ The proposed development covers an area of 1.15 acres or 12% of the total <br />drainage arcs. The capaciD, of the exit. ring storm sewer is 14 cfs. If approved in the <br />raann~ propose& the expanded self-sm-race storage fa~I/ry would have a tot. al knpervious <br />m o~3.5 am-es. ~his would generate enough runoff to equal the capacity of the existing <br />storm~ar~r.pipe for.2 year ~ <br /> ,, .~,;.,~-, ,....~:~.. .__, -j;~ ...... ::,v,~. ' ..... ; ..... .;4.'~:~.~'~J- . ._-._' -~'='-~. '--,.~..'::.':: 7 <br /> <br />If the ¢ apmty of the storm sewer were to be allommd based upon ~ the d/schar~e fi'om <br />the proposed development should be !~mit. ed to 1.? cfs, As proposed, thc runoff/a-om this <br />facility!from s 2 ye. ar storm would be 3.8 ¢fs. However, since theranofffl-om the existing <br />self stl .ra~e facility already exceeds its proportionate share of the capacit3,, I would <br />recom~ ~end that the aforementioned discharge l~mitafion be allowed on the condition that <br />the exJ ~ring self storage be reduced through thc installation of detention volume when <br />conc-m .. curb is/nstalled to meet the 1997 fasility reqmnts. <br /> <br />Tlae u~ount of volume needed to a¢hieve a discharge of 1.7 cl~ could be a¢hieved by <br />cons ~m~g a two foot deep ve¢ sump m along the eastm'n property line. Such a sump <br />could ~ mude mowable by ut~li75ng a mum side slope of 4:1 und would occupy a <br />width Of approximately 20 feet. .. ~,... <br /> <br />A revi.,~,d drainage plan datext February 23, 1994 was Teceived which shows one-half of <br />the run,~ff generamd to be diver'md to the west into the':Ciry. Park. There is a berm in close <br />proxin~,~ty to the sites western boundary in thc City park which carries a paved park wail, <br />beyond~which is a L2a'aded depression covered by a drainage easement. A culvert would <br />need to}be plac~ through the berm to ~-e. aeh this easement. Ln ~cldqfion, the capacity of the <br />detention arm of the drainage easement was paid for by thc developers of the R.ivenwiek <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.