My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/10/1994
Ramsey
>
Public
>
Agendas
>
Council
>
1994
>
Agenda - Council - 05/10/1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 4:07:49 PM
Creation date
10/13/2003 1:16:15 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/10/1994
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUTHO IIZATION FOR STAKING ON <br /> By: Steven Jankowski, <br /> <br /> CASE # <br /> <br />PHASE II; SUNWOOD DRIVE <br />City Engineer <br /> <br />Background: ? <br /> <br />On October 12, i993, after considering proposals from four consultants for providing engineering <br />services in conjBnction with the development of Sunwood Drive, Council selected Hakanson <br />Anderson to pro~,ide the various work elements associated with the design and construction of the <br />roadway. As yc~u may recall, the construction of the roadway was divided into two phases, with <br />Phase I being th~ segment between Wood Pond Hills and County Road #57, which is scheduled to <br />initiate constru~ion this year, and Phase II being that portion between County Road #57 and <br />County Road #1 ~6, currently scheduled for construction to be completed in 1996. <br /> <br />This summer, Waste Management will be completing the work associated with the final <br />abandonment of~e landfill. A considerable amount of grading will occur and Waste Management <br />has agreed to perform the rough grading associated with Phase II of the construction of Sunwood <br />Drive in conjunclion with their landfill abandonment. In order to accomplish this rough grading, a <br />substantial amou]m of grade stakes will be required. Since the proposal approved by City Council <br /> <br />specifically limi~ <br />this authorizatior <br />no cost by Wast <br />phase of this pro. <br />our current contr. <br />the cost of the w, <br /> <br />~d the authorization for staking to Phase I of the project, Staff is requesting that <br />be extended to Phase II to take advantage of the grading that will be performed at <br />: Management. Consistent with out agreement for staking services in the first <br />ect, the actual cost will be billed on an hourly basis at the same rate identified in <br />ct; however, I am attaching a proposal from Hakanson Anderson which estimates <br />~rk to be $5,435. <br /> <br />Council Action: <br /> <br />Motion to adopt Resolution ~t94-05- mending contract for engineering services for Sunwood <br />Drive N.W. <br /> <br />Reviewed by: Copies also distributed to: <br /> <br />City Engineer . Finance Officer <br />City Administrator <br />City Attorney . <br /> <br />CC: 05/10/94: <br />/jmt <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.