PUBLIC WORKS MONTHLY REPORT <br /> JULY 1994 <br /> <br />Most of the time:spent by Public Works personnel was in patching and overlays in preparation for <br />sea]coating and Overlays which have been completed, We are still patching throughout the City <br />and should be dor~e by the end of August. <br /> <br />Din sn-eets were graded three times in July. <br /> <br />Storm sewer maintenance consisted of cleaning catch basins and culverts and drywell cleaning. <br />We were assisted by the City of Anoka with their Vactor truck for cleaning culverts and the <br />drywell. <br /> <br />Sign installation included traffic control signs and street name signs. <br /> <br />We started mowing roadsides in July and will be done by mid-August. <br /> <br /> <br />