Laserfiche WebLink
CASE <br /> <br />CONSIDERATION OF SIDEWALK <br />CONSTRUCTION ON DYSPROSIUM STREET <br /> By: Steven J. Jankowski, City Engineer <br /> <br />Background: <br /> <br />At the July 26, :1994 meeting, the City Council considered a number of measures that might be <br />considered to a~ldress the concerns of a petition received by residents of the Flintwood Hills <br />SubcLivision with regard to traffic on Dysprosium Street N.W. You will recall, at that meeting, that <br />the City Councit~ directed Staff to pursue and investigate the installation of sidewalk as a means for <br />increasing safety, along the street. The City Council further directed Staff to propose some rough <br />cost estimates arid methods for financing such a project. This case is in response to that directive. <br /> <br />ALTERNATIVI~ 1: <br /> <br />This alternative gonsiders the installation of a five-foot concrete sidewalk which would be placed <br />along the west Side of Dysprosium Street N.W. from ifs northern boundary, south to County <br />Road #116. In iaddition, sidewalk would be placed along the west side of Dysprosium Street <br />N.W. from 141s:t Avenue N.W. south to County Road #116. Sidewalk installation was proposed <br />in these locations due to the fact that these are the areas along Dysprosium Street N.W. where <br />houses and drives front directly on the street. Other areas along the east side of Dysprosium Street <br />N.W. have driveway and house frontages onto other residential streets. The cost of this <br />alternative, incla~ding sidewalk turf restoration with sod and driveway patching, is estimated to be <br />$62,000. ff this Cost were divided equally among the fronting property owners, the individual cost <br />would be in the/'ange of $1,000 per property. <br /> <br />ALTERNATIVE 2: <br /> <br />This alternative ~Would consist of placing sidewalk down the entire length of Dysprosium Street <br />N.W. between Opunty Road #5 and County Road #116. The larger scope of this project might be <br />considered to gegerate benefit to all the citizens in Flintwood.Hills who utilize Dysprosium Street <br />N.W. as a main fl'affic way to other portions of the City outside the subclivision. The cost of this <br />project is esfim~ed to be $90,000. If it were divided equally among all the property owners in <br />Flintwood Hills, ~e per unit cost would be approximately $600. <br /> <br />Recommendation: <br /> <br />It is Staffs recommendation that Alternative #1 be pursued if sidewalk is to be considered as an <br />additional safetyimeasure along Dysprosium Street N.W. The reason for this recommendation is <br />that we feel the5 benefit derived is more closely tied to the fronting property owners along <br />Dysprosium Street N.W. The benefits to other non-adjacent properties in Flintwood Hills is less <br />apparent. <br /> <br />Should the Council wish to proceed further with consideration of this project they should direct <br />Staff to initiate ~ public improvement project for the installation of sidewalk along Dysprosium <br />Street N.W. <br /> <br />Council Action: <br /> <br />Based upon discussion. <br /> <br />Reviewed by: <br /> <br />Also distributed to: <br /> <br />City En~neer <br /> <br />City Administrator <br />Finance Officer <br />City Attorney <br /> <br />CC: 8/23/94 <br /> <br /> <br />