My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/27/1994
Ramsey
>
Public
>
Agendas
>
Council
>
1994
>
Agenda - Council - 09/27/1994
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2025 4:09:49 PM
Creation date
10/14/2003 8:59:08 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/27/1994
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Suibsurface Exploration and Go. technical Engineering £vgluation for the <br />Extension of Sewer and Water Trunks to Service the <br /> Anoka Electric C~per~tive Expansion Site <br /> in the City ~f Ramsey, ~innesota <br /> <br />INTRODUCTION <br /> <br />Plans call fo~ the extension o£ municipal .~ewer and wetter trunks to an industrial site in the western <br />half of Secti;on 27, Township 32, Range 25 which is to be developed by [he Anoka Electric <br />Cooperativeifor their new maintenance facility. Tmals t)f 1800 feet of 30-inch sanimw sewer, <br />1600 feet of ~ ?,-inch sanitau' sewer and 64{IC} fce~ m' 16-inch wate~:~in arc called for. <br /> <br />We propose!reccmnai.~sanc~ drilling and rcm[in~ gcotechnicnI testing [hat will allow us to <br />determine su-bsurface conditions at 12 locations alcmg the planned .~;ewer and water alignments. <br />Analysis of ~.rilling and testin,~ results, [o~ether with rccomrnenda[ion.~ for pipe foundation(.q and <br /> <br />dewatering 4ill be provided. <br /> <br />SCOPE OF WORK <br /> <br />We propose m drill a tot;ii of' 12 soil boring.,~ ut lt~cati(ms :~lcmg the proposed utility alignments. <br />Six of the boings will be alon- the propnsed 30-inch sanitary sewer ali~nmenL two borings will <br />b~ along the ~proposed la-inch sanitary sewer alignment, and four borings will be along ~h~ <br />proposed muflJcipal wate~ain alignmenL Th~ eighi sewer :di~nmen~ borings will be d~lled to an <br />average depth~ oF 30 feet while the four waemain :alignment borings will be drilled m an aver~g~ <br />depth of lO feet. A total or' 2~(1 fee~ of horin,~s will he :~dv:mced. <br /> <br />Once RLK unit STS h:we agreed on thc borin,:j lc, cation.*:. £TS will coorciinate thc utility clearance <br />through the GOpher State One Call system. RI.K will survey the lcx:atkms of [h¢ borings, <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.