Laserfiche WebLink
REPORT OF FINAL PROJECT COST <br />IMPROVEMENT PROJECT ~93-13 <br /> <br />Description: <br /> <br />B~tuminous surfacing of 164th Lane <br />[(J~ounty Road #5] west to its terminus. <br /> <br />N.W. from <br /> <br />Nowthen <br /> <br />Boulevard N.W. <br /> <br />Construction Coats - W.B. Miller 'Inc. <br /> <br />S u bgradeiPreparation <br />Class 5 Aggregate Base <br />BituminoUs Wear Course Type 41 <br />Grub Trees <br />Turf RestOration <br />Drivewa~ Restoration <br />Total ConstructiOn Cost <br />Overhead @ 25°/~ <br /> <br />Total Project Co~t <br /> <br />Cost Per Unit (14 units) <br /> <br />Estimated Cost Per Unit <br /> <br />L,S. <br />600 m @ $6/tn <br />337.6 tn @ $24.80/tn <br />1 ea @ $100/ea <br /> <br />$ 1,500.00' <br /> 3,600.00 <br /> 8,372.00 <br /> 100.00 <br /> 1,000.00 <br /> 917.00 <br />$ 15,489.00 <br /> 3,872.00 <br />$ 19,361.00 <br /> <br />$ 1,382.93 <br /> <br />$ 1,693.00 <br /> <br /> <br />