Laserfiche WebLink
PUBLIC WORKS MONTHLY REPORT <br /> SEPTEMBER 1994 <br />By: Merle Mevissen, Public Works Supervisor <br /> <br />Tasks time wa~s spent on in September included patching pot holes and some sweeping of <br />streets in new tlevelopments. Shoulder maintenance was done mainly on new black-topped <br />roads and ove4JaYs, and some on old existing streets. Dirt ro,a_ds were graded three times in <br />September. W~e did some ditch cleaning because of resident s requests; much more should <br />be done but v$~ probably won't get to it due to lack of time. Storm sewer maintenance <br />consisted of cl~eaning catch basins. The time spent on building maintenance was working <br />on the new Pul~lic Works facility, removing things attached to the walls and ceiling. <br /> <br />We did some ~ee trimming after a windstorm downed several trees. <br /> <br />Work on the n~ew Public Works facility is progressing slowly. The cement contractor cut <br />in the opening~ for the doors and blocked up holes in the walls. Work is still being done <br />on the walls. The roofing contractor is repairing the roof at the present time and should be <br />done by the entt of the month. <br /> <br />/jmt <br /> <br /> <br />