My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/11/2011
Ramsey
>
Public
>
Agendas
>
Council
>
2011
>
Agenda - Council - 10/11/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:19:29 PM
Creation date
10/7/2011 8:54:03 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/11/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 6. 1. <br />Meeting Date: 10/11/2011 <br />By: Tim Himmer, Engineering/Public Works <br />Title: <br />Public Hearing and Levy of Special Assessments for the 2011 Street Maintenance Program <br />Background: <br />The 2011 Street Maintenance Program consisted of six individual projects addressing the maintenance needs on 13.47 miles of <br />City streets. Projects 11 -01 through 11 -04 addressed 11.93 miles of City streets, and received a crack fill/sealcoat maintenance <br />improvement. Projects 11 -05 and 11 -06 addressed 1.54 miles of City streets, and received a one and one -half inch (1 1 /2 ") <br />bituminous overlay on top of the existing bituminous pavement. <br />All projects have been substantially completed and the final costs have been determined. It is City policy to assess 50% of the <br />project cost to the benefited property owners for overlay projects. The crack fill/sealcoat assessments were also previously <br />assessed 50% of the project cost; however the assessment on this type of maintenance work is being phased out over the next <br />several years. This year the assessment for crack fill /sealcoat work is 22% of the project cost. The remaining portions of these <br />projects are financed through City general funds and Municipal State Aid (MSA) funds. IP 11 -04, which includes an MSA <br />street, is proposed to be assessed the average amount assessed to other projects receiving the same improvement. <br />Below is a summary of the assessments proposed on each project, along with a comparison to the estimated costs mailed to <br />property owners prior to the April 12, 2011 public hearing. In most instances the actual costs were less than those estimated in <br />the feasibility study; with the exception of the overlays, which were slightly higher due to more patching being required. <br />Project Description <br />Crack Fill /Sealcoat <br />11-01 River's Bend 3rd & 4th <br />11 -02 Riverside West <br />11-02 Ford Brook Estates <br />11-02 Section 6 & 7 (unplatted) <br />11-02 Section 16 (Welcomes Road) <br />11-02 Hall- Anderson Acres <br />11-02 Forest. Hideaway <br />11 -03 Oakridge Estates <br />11-03 Alpaca Estates <br />11-04 MSA - Xkimo Street <br />Overlay <br />11-05 157th Lane <br />11 -06 Oak Run <br />11-06 Stanhope River Hills <br />11 -06 Oakridge Estates <br />$ 61.20 <br />$ 150.85 <br />$ 150.85 <br />$ 150.85 <br />$ 150.85 <br />$ 150.85 <br />$ 150.85 <br />$ 225.12 <br />$ 225.12 <br />$ 168.60 <br />$ 1,624.10 <br />$ 2,264.10 <br />$ 2,264.10 <br />$ 2,264.10 <br />Information <br />Final Proposed Estimated Assessment <br />Assessment from Feasibility Study <br />% of Estimate <br />$ 66.00 92.7% <br />$ 164.00 92.0% <br />$ 164.00 92.0% <br />$ 164.00 92.0% <br />$ 164.00 92.0% <br />$ 164.00 92.0% <br />$ 164.00 92.0% <br />$ 244.00 92.3% <br />$ 244.00 92.3% <br />$ 183.00 92.1% <br />$ 1,621.00 100.2% <br />$ 2,260.00 100.2% <br />$ 2,260.00 100.2% <br />$ 2,260.00 100.2% <br />Recommendation: <br />Following the close of the Public Hearing adopt the attached resolutions which levy special assessments on Improvement <br />Projects #11 -01 through #11 -06. <br />
The URL can be used to link to this page
Your browser does not support the video tag.