My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/11/2011
Ramsey
>
Public
>
Agendas
>
Council
>
2011
>
Agenda - Council - 10/11/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:19:29 PM
Creation date
10/7/2011 8:54:03 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/11/2011
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 6. 5. <br />Meeting Date: 10/11/2011 <br />By: Tim Himmer, Engineering/Public Works <br />Information <br />Title: <br />Public Hearing and Levy of Special Assessments for City Improvement Project #10 -07; Alpine Drive/Roanoke Street <br />Improvements <br />Background: <br />On May 11, 2010 the City Council ordered the bituminous overlay on portions of Alpine Drive and Roanoke Street, and <br />authorized staff to prepare plans and specifications. During the design phase a bituminous trail was added along the north side <br />of Alpine Drive, from the access to the Northfork golf course to Armstrong Boulevard. This project was originally included in <br />the feasibility study for the 2010 Street Maintenance Program (SMP), which was adopted on February 9, 2010, but due to <br />funding constraints a stand alone project was created so a majority of the proposed improvements could be financed through the <br />City's Municipal State Aid (MSA) account. The public hearing was held on March 9, 2010. <br />The scope of the final project included: <br />• Milling the existing bituminous roadway surfaces, and patching base deficiencies. <br />• Curb and gutter replacement as necessary. <br />• Storm sewer improvements, including additional facilities within the project area and extensions to support the 2011 SMP. <br />• Whistle -free zone improvements at the railroad crossing on Alpine Drive. <br />• A new 1 I /2" lift of bituminous asphalt. <br />• A bituminous trail along the north side of Alpine Drive. <br />Observations: <br />This project has been substantially completed and the final costs determined. Since this is an MSA road it is City policy to only <br />assess the average amount levied against other projects receiving the same improvement within the same year. Therefore, the <br />assessments on this project are at the same rate as City Improvement Project #10 -06, which this project was originally grouped <br />within the 2010 SMP. <br />Recommendation: <br />Following the close of the Public Hearing adopt the attached resolution which levies the special assessments for Improvement <br />Project #10 -07; Alpine Drive/Roanoke Street Improvements. <br />Funding Source: <br />The Alpine Drive/Roanoke Street improvements are financed via the City MSA Fund, Stormwater Utility Fund, and special <br />assessments to benefiting property owners. Assessments to residents are limited to the average overlay assessment from the <br />2010 Street Maintenance Program. The funding breakdown is as follows: <br />FINAL COSTS FUNDING SOURCE <br />Resolution Adopting Assessment <br />Final Assessment Roll <br />MSA <br />$675,838.25 $547,181.55 $ 117,087.50 <br />STORMWATER UTILITY ASSESSMENTS <br />Council Action: <br />Motion to adopt Resolution #11- 10 -XXX levying assessments for Improvement Projects #10 -07; Alpine Drive/Roanoke Street <br />Improvements. <br />Attachments <br />$11,569.20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.