My WebLink
|
Help
|
About
|
Sign Out
Home
06/28/11
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Housing & Redevelopment Authority
>
Minutes
>
2010's
>
2011
>
06/28/11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2025 1:53:34 PM
Creation date
10/20/2011 3:56:57 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Document Title
Housing & Redevelopment Authority
Document Date
06/28/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
HRA BUSINESS <br /> Case #1: Review Options for Feasibility Study — Sunwood Drive Realignment <br /> Development Manager Lazan reviewed the staff report. <br /> Commissioner McGlone clarified we have development opportunities on the south side and <br /> should have opposite work on both sides with the new alignment for Armstrong Boulevard going <br /> over Highway 10, which would require moving Sunwood Drive. <br /> Development Manager Lazan agreed, adding that Armstrong Boulevard has to be 30 feet above <br /> the rail but we can't get back to grade with how it is constructed today so this interchange has to <br /> move. He added that the City can only have one access at Highway 10 and Bunker Lake <br /> Boulevard so it wouldn't be left where it is today. Development Manager Lazan added five <br /> individuals have come forward for two to three positions in this area on the offer, but added they <br /> first need the Sunwood Drive relocation information, including a retail developer estimate for the <br /> remaining 30 -50 acres. He stated the City needs to know the road location too. <br /> Commissioner McGlone stated this will help define the project and get it back into private <br /> development. <br /> Commissioner Ramsey inquired about the timeframe from start to final design for realignment of <br /> Sunwood Drive. <br /> Development Manager Lazan said the feasibility study will be done this summer and be brought <br /> to the Board for consideration soon. He said they will need to prepare plans over the winter for a <br /> spring start, adding there could be variable approvals at the State level. <br /> Councilmember Backous inquired about the sub consultants. <br /> Development Manager Lazan said consultants were included in the traffic and roundabouts, but <br /> does not include WSB work. <br /> Public Services Director Olson said the work does not include appendix references to the <br /> intersection capacity on signalized intersections, adding this traffic figure won't update all of <br /> those intersections. <br /> Development Manager Lazan said he will verify but said not all are included in the 120 exhibits. <br /> Public Services Director Olson stated his other concern is the intersection between Highway 10 <br /> and Bunker Lake Boulevard, stating that even if we could get down after the railroad tracks we <br /> wouldn't want a signal there because it would back up traffic over the tracks, creating a safety <br /> hazard. <br /> Chairperson Elvig said this is a big change and that pushing forward with an overpass would be a <br /> good project but the lack of foresight may be as to capacity of the entire area and if we continue <br /> Housing and Redevelopment Authority / June 28, 2011 <br /> Page2of7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.