Laserfiche WebLink
er:La e BWd 7i <br />Existing <br />Anoka Municipal Utility <br />Enterprise Park <br />Distribution Substation <br />Dayton <br />TIM R'22 W <br />Rejected Route <br />Segment 1 <br />Rejected Route <br />Segment 9 <br />T 32N R 25W. <br />Rejected Route <br />Segment 2 <br />Proposed Great River Energy <br />115 kV Transmission Route <br />• — Grant St•dSAN'37 <br />Rejected Route <br />Segment 7 <br />Rejected Route <br />Segment 3 <br />Rejected Route <br />Segment 6 <br />Rejected Route <br />Segment 5 <br />City of <br />Andover <br />T31NR25W <_ <br />"N <br />Rejected Route <br />Segment 4 <br />Existing <br />Xcel Energy <br />Crooked Lake <br />Transmission Substation <br />Great River Energy <br />— Proposed Route <br />- Rejected Route 1 <br />- Rejected Route 2 <br />- Rejected Route 3 <br />Rejected Route 4 <br />- Rejected Route 5 <br />Rejected Route 6 <br />Rejected Route 7 <br />Rejected Route 8 <br />— Rejected Route 9 <br />Existing Great River Energy (GRE) <br />—115 kV AC Transmission <br />Existing Anoka Municipal U51ity (AMU) <br />* Distribution Substation <br />Existing Xcel Energy (XE) <br />A Transmission Substation <br />Existing Anoka Municipal Utility (AMU) <br />— 69 kV Transmission Line <br />Existing Xcel Energy (XE) <br />— —115 kV Transmission Line <br />0 1,000 <br />N <br />2,aFF et A <br />e <br />Data Sources Vary Between <br />MNDOT, MNDNR, MNGEO <br />and Great River Energy. <br />2010 Color Orthophotos from <br />Farm Services Administration. <br />Map Projection: <br />UTM, NAD83, Zone15, Meters <br />Enterprise Park <br />115 -kV Project <br />Figure 4 -2 <br />Rejected <br />Routes <br />Updated: 8f2612011 <br />