Laserfiche WebLink
t 9 <br />..36 •' <br />K1FpOPCO'LCC <br />313224230001 <br />MINNESOTA <br />GREAT RIVER <br />ENERGY® <br />A Touchstone Energy' Cooperative <br />Great River Energy <br />=Proposed Route <br />Conceptual Alignment <br />- Conceptual Alternate Alignment <br />Easement Area (70 ft) <br />Existing Anoka Municipal Utility (AMU) <br />Distribution Substation <br />Existing Xcel Energy (XE) <br />• Transmission Substation <br />Existing Great River Energy (GRE) <br />— —115 kV AC Transmission <br />Existing Anoka Municipal Utility (AMU) <br />— 69 kV Transmission Line <br />Existing Xcel Energy (XE) <br />— —115 kV Transmission Line <br />N <br />0 100 200 300 400 <br />Feet <br />Data Sources Vary Between <br />MNDOT, MNDNR, MNGEO <br />and Great River Energy. <br />2010 Color Orthophotos from <br />Farm Services Administration. <br />Parcel Data from Anoka <br />County GIS. <br />Map Projection: <br />UTM, NAD63, Zone15, Meters <br />Enterprise Park <br />115 -kV Project <br />Figure 4-1G <br />Proposed Route <br />Map G <br />Updated: 9/30/2011 <br />