My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Planning Commission - 11/03/2011
Ramsey
>
Public
>
Agendas
>
Planning Commission
>
2011
>
Agenda - Planning Commission - 11/03/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 10:09:19 AM
Creation date
10/31/2011 8:07:42 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Planning Commission
Document Date
11/03/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review Process Flowchart <br />evrelo ' ment A ' ' rove <br />1 ZE 2 M 31 1.114 �5 411r6a 77 <br />BE SCHEDULE <br />INFORMED INFORMAL <br />Introduce MEETING <br />yourseff to You meet with <br />how our Development <br />development Review Cons <br />review works. mittee (DRC) <br />staff from <br />GOAL: Make various depart - <br />sure your ments to review <br />develop- your proposal. <br />mart idea is They den - <br />feasible lily what you <br />need to make <br />a complete <br />application <br />and discuss <br />the anticipated <br />timeline. <br />SUBMIT <br />APPLICATION <br />You submit a formal application <br />with the information: plans and <br />fees identified in the appropri- <br />ate city cheddisi(s). Your plans <br />are reviewed by DRC staff and <br />outside agencies, if required. <br />Within 15 working days, staff <br />determines completeness. tf <br />complete, staff provides a tenta- <br />tive review schedule in writing. If <br />incomplete, staff identifies specific <br />Hems required to make the ap- <br />plication complete_ <br />Dependent or specific amaze - <br />stances, you may wish to sched- <br />ule a neighborhood meeting at <br />this paint <br />STAFF <br />REVIEW <br />Once an application is <br />complete, DRC staff meets to <br />discuss their comments. <br />Applicanls with larger projects <br />are encouraged to schedule a <br />face-to-face meeting to receive <br />DRC comments. <br />You revise your plans to ad- <br />dress DRC comments. The <br />extent of revisions vanes. <br />depending on the nature of the <br />required revisions. <br />The first staff review typically <br />takes 10-12 working days. <br />Subsequent reviews may <br />take less tine. <br />1 / <br />Planning staff coordinates <br />comments from all departments <br />into a single report. <br />Development Review Manual (September 2011) <br />Review Flowchart <br />Page 6 of 45 <br />PLANNING CITY <br />COMMISSION COUNCIL <br />REVIEW REVIEW <br />The Planning Staff prepares <br />Commission holds a report wi h a <br />a public meeting recommended mo- <br />or hearing on your tion, a summary of <br />application, depen- the Planning Com- <br />dent on the type of mission meeting, <br />applicationand a copy of the <br />Planning Commis - <br />The Commission Sion staff repert <br />typically recom- and minutes. <br />mends approval <br />with conditions or If a develop - <br />denial with findings men) contract is <br />and moves the ap- required, staff pre- <br />plication forward to pares fhe contract <br />the City Counciland you submit <br />an executed copy <br />prior to the City <br />Councl meeting. <br />STEP <br />5 <br />SUBMIT <br />PERMIT <br />APPLICATION <br />You submit a <br />formal application <br />with all plans and <br />supporting docu- <br />ments identified <br />in the appropriate <br />city checklistlErnif <br />POSTAPPROVAL <br />Assuming a positive outcome, you <br />receive a letter from the city with a copy <br />of the approving resolution attached. <br />For larger projects, staff contacts you to <br />set up a meeting with your entire team <br />to review what you need to provide be- <br />fore the city will issue a building permit <br />PLAN REVIEW <br />For new one and two tally home <br />conshuchon, review takes a maximum <br />of 5 business days upon receipt of <br />a complete application and support- <br />ing documents. Up to 5 additional <br />days may be needed to evaluate any <br />revised plans and documents. <br />For commermallindustnalimulti-famiy <br />oonstruhon (new and additions), re- <br />view takes a maximum of 10 business <br />days upon receipt of a complete ep- <br />pication and supporting documents. <br />Wish input from varous city depart- <br />ments, Building staff provides a letter <br />detailing any plan deficiencies. Up <br />to 10 additional days may be needed <br />orme revised plans and documents <br />are submitted. <br />SCHEDULE <br />INSPECTIONS <br />You must <br />contact the <br />Building Divi- <br />sion to arrange <br />for required <br />OTHER inspections. <br />PERMITS Inspection <br />In addition to requests for <br />the building specific times <br />permit, you will be honored <br />will need to whenever <br />obtain permits passible_ N the <br />for sewedwa- requested time <br />ter, plumbing, is not available, <br />mechanical the customer <br />and electrical witl be advised <br />systems, fire so that an alter - <br />sprinkler and nate time or the <br />alarm sys- nerd business <br />tens and sign day can be <br />made. instillation. selected_ <br />7'� 9 90 Lail <br />OBTAIN <br />BUILDING <br />PERMIT <br />When the permit <br />and plans are <br />ready for is- <br />suance, staff <br />contacts you with <br />the permit fee <br />amount <br />The stamped ap- <br />proved plans and <br />inspection record <br />card must be kept <br />on the job site <br />until all inspection <br />approvals are <br />RECEIVE <br />CERTIFICATE OF <br />OCCUPANCY <br />Once all work <br />is completed <br />and all required <br />final inspections <br />approved, upon <br />request, the Build- <br />ing Division is- <br />sues a certificate <br />of occupancy <br />
The URL can be used to link to this page
Your browser does not support the video tag.