My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 08/15/2011
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2011
>
Agenda - Public Works Committee - 08/15/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:17:42 AM
Creation date
11/3/2011 8:33:54 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
08/15/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project complete, they will notify the Contractor in writing giving reasons thereof. If the Engineer <br />and Owner consider the Project complete, they will prepare and deliver to the Owner an application <br />for final payment. <br />28.2 The Owner shall have the right to exclude the Contractor from the Project after the date of <br />completion, but the Owner will allow the Contractor reasonable access to complete or correct items of <br />repair and maintenance <br />ARTICLE 29. Final Payment <br />29.1 After the Contractor has completed any corrections to the satisfaction of the Engineer and <br />delivered all maintenance and operating instruction, schedules, guarantees, bonds, certificates of <br />inspection and other documents, all as required by the Contract Documents, he may make application <br />for fmal payment. The final application for payment shall be accomplished by such supporting data <br />as the Engineer may require, together with complete and legally effective releases or waivers <br />(satisfactory to the Owner) of all liens arising out of the Contract Documents and the labor and <br />services performed and the material and equipment furnished thereunder. In lieu thereof and as <br />approved by the Owner, the Contractor may furnish receipts of releases in full; an affidavit of the <br />Contractor that the releases and receipts include all labor, services, material and equipment for which <br />a lien could be filed, and that all payrolls, State and Federal withholding taxes, material and <br />equipment bills, and other indebtedness connected with the Work for which the Owner or his <br />property might in any way be responsible, have been paid or otherwise satisfied; and consent of the <br />Surety, if any, to final payment. If any Subcontractor or supplier fails to furnish a release or receipt <br />in full, the Contractor may furnish a bond satisfactory to the Owner to indemnify him against any <br />lien. <br />29.2 If, on the basis of his observation and review of the Work during construction, his final <br />inspection and his review of the final application for payment all as required by the Contract <br />Documents, the Engineer is satisfied that the Work has been completed and the Contractor has <br />fulfilled all of his obligations under the Contract Documents, he will, within fifteen (15) Calendar <br />Days after receipt of the final application for payment, indicate in writing his approval of payment <br />and present the application to the Owner for payment. Otherwise, he will return the application to the <br />Contractor, indicating in writing his reasons for refusing to approve fmal payment, in which case the <br />Contractor will make the necessary corrections and resubmit the application. The Owner, will, within <br />twenty (20) Calendar Days of presentation of an approved application for payment, and receipt of <br />final payment documents pay the Contractor the amount approved by the Engineer. <br />ARTICLE 30. Retention of a Portion of the Contract Sum <br />The Owner may retain up to a maximum of ten percent (10 %) of value of Work completed and <br />requested for payment. After fifty percent (50 %) of the Work has been completed, the Contractor <br />may request consideration for a reduction in the retained amount. Where the Owner is subject to the <br />provisions of Minnesota State Statutes 429.041 Section 6 the maximum retained amount shall be five <br />percent (5 %) released with approval of the governing body. Those amounts released shall be <br />considered not required to be retained to protect the Owner's interest in satisfactory completion of the <br />Agreement. <br />GC 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.