My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 08/15/2011
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2011
>
Agenda - Public Works Committee - 08/15/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:17:42 AM
Creation date
11/3/2011 8:33:54 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
08/15/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
âś“Iunicode Page 4 of 5 <br />b Compensate the local road authority in an amount satisfactory to that road authority and concurred in by the city <br />engineer for the restoration of that haul road by the city. <br />The fact that other traffic has used the haul road concurrently with the hauling of the above- described materials shall not <br />relieve the operator of their obligation to maintain and restore the haul road as above provided. <br />The city engineer's determination as to the kind and amount of maintenance and restoration work required to restore the haul <br />road to a condition equal to that which existed at the time the hauling operations were started shall be final, binding and <br />conclusive. <br />(7) When hauling over any designated haul road has been completed and the operator has restored that road or has <br />compensated for that restoration as required, the city engineer will accept such restoration or concur in such financial <br />settlement for the restoration of the haul road (as the case may be) in writing, and such acceptance will relieve the operator <br />of any additional obligation in connection with the restoration of that road. <br />(8) If the operator fails or refuses to perform haul road restoration or to make satisfactory financial settlement for such restoration <br />as required within the period specified in a written notice by the city engineer, the city,will cause the restoration work to be <br />done and require reimbursement therefor from the operator's surety. <br />(9) Operators shall obey all state, county and municipal road limits and other applicable traffic regulations in hauling to and from <br />the work site. Operators shall also restrict trucks hauling to and from the work site to the use of those public highways <br />designated by the permit. <br />Site restoration. All grading, mining and filling sites shall be restored immediately after operations cease. Restoration shall be <br />complete within 60 days of the cessation of operations. The following standards shall apply to restoration: <br />(1) The peaks and depressions of the work site shall be graded and backfilled to a surface which will result in a gently rolling <br />topography in substantial conformity to the land area immediately surrounding the work site and which will minimize erosion <br />due to rainfall. No finished slope shall exceed 12 percent in grade. <br />(2) Restoration shall begin after the grading, mining and /or filling of 25 percent of the total area to be mined or five acres, <br />whichever is less. Once these areas have been graded, mined or filled, they shall be sloped and seeded as per the <br />restoration plan, <br />(3) Restored areas shall be surfaced with a soil of a quality at least equal to the topsoil of land areas immediately surrounding <br />the work site, and to a depth of at least six inches. The topsoil shall be seeded, sodded, or planted with grasses. Trees and <br />shrubs may also be planted but not as a substitute for grasses. Such planting shall adequately retard soil erosion. <br />(4) The finished grade shall be such that it will not adversely affect the surrounding land or future development of the work site <br />and shall be consistent with the end use plan. <br />(5) Within 30 days after the deposit of approved fill materials, the filled area, shall be covered with a minimum of six inches clean <br />fill, and the depth of the fill shall be controlled to blend with the surrounding ground conditions. <br />(k) Existing operations. Existing grading, mining and filling operations shall comply with these provisions within 180 days following the <br />effective date of the ordinance from which this subsection is derived. <br />(Code 1978, § 9.11,12; Ord. No. 87 -9, 1 -11 -1988; Ord, No. 97 -15, 12 -1 -1997; Ord. No. 01 -15, 7 -30 -2001; Ord. No. 03 -30, 9 -15 -2003) <br />(i) <br />(5) <br />(6) <br />
The URL can be used to link to this page
Your browser does not support the video tag.