Laserfiche WebLink
Public Works Committee 5. 3. <br />Meeting Date: 10/18/2011 <br />By: Grant Riemer, Engineering/Public <br />Works <br />Title: <br />Contracted Street Sweeping <br />Background: <br />At the May 17 PW meeting the conversation was started about contracting out spring street sweeping. Spring <br />sweeping would be the best fit for contracted services because of the urgency involved. Sand and debris from the <br />winter needs to removed from the streets, as soon as possible, before spring rains can wash it into the storm water <br />system. Spring is also the busiest time for the PW department. Crews are busy repairing winter damage to the <br />ROW, signs knocked down in traffic accidents, localized flooding, potholes and making the transition from winter <br />to spring in general. Three options could be considered if we propose to contract out spring sweeping. <br />1. Have the contractor supply additional sweepers and work with city staff to perform the task. The most common <br />scenario in this option is the contractor supplies X number of additional sweepers and the city supplies the dump <br />trucks and water truck needed to support the operation. Upside would be sweeping time would be cut dramatically, <br />but the downside is staff and equipment would still be required. <br />2. Option two would have the contractor perform all aspects of the operation, including hauling the debris and <br />supplying the water truck. The upside would be PW staff would be free to work on other spring time projects. The <br />down side would be expense. Rates for equipment rental were running from $ 76.00-$83.00/ hour for pickup broom <br />sweepers and $80.00/hour for tandem dump trucks in 2011. <br />3. Option three would be a combination of the first two options. Have the contracted forces sweep our <br />curb/storm-water areas and city staff could sweep the ditched areas. The curbed areas are more time sensitive, <br />while the ditched areas allow for more flexibility. <br />Notification: <br />Observations: <br />Funding Source: <br />Funding would come from the Storm Water Utility. <br />Staff Recommendation: <br />Request prices from sweeping contractors for spring 2012 street sweeping. Once bid prices are received, determine <br />to what degree we want to use contractors. <br />Committee Action: <br />Direct staff to seek RFP's for spring street sweeping 2012 <br />Form Review <br />Inbox Reviewed By Date <br />Brian Olson Brian Olson 10/13/2011 08:44 AM <br />Kurt Ulrich Kurt Ulrich 10/13/2011 03:29 PM <br />Form Started By: Grant Riemer Started On: 10/11/2011 11:38 AM <br />Final Approval Date: 10/13/2011 <br />