My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 10/18/2011
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2011
>
Agenda - Public Works Committee - 10/18/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:18:29 AM
Creation date
11/3/2011 8:37:54 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
10/18/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Committee 5. 5. <br />Meeting Date: 10/18/2011 <br />By: Tim Himmer, Engineering/Public <br />Works <br />Title: <br />Consider Change Order for City Improvement Project #11-09; Alpine Drive Overlay <br />Background: <br />The Alpine Drive Overlay project, from Ramsey Boulevard to 153rd Court, was approved by the Public Works <br />Committee at their March 2011 meeting. During discussion it was decided to break the project into two, with phase <br />one occurring in late 2011 and including an edge mill and overlay from Ramsey Boulevard to 153rd Court. Phase <br />two would be delayed until 2012 and include an edge mill and overlay from 153rd Court to Sunfish Lake <br />Boulevard (and the investigation of additional alternative technologies that would prolong the life of the pavement), <br />and a trail along the north side of Alpine Drive that would connect Alpine Park to Ramsey Boulevard and north to <br />the recently completed boardwalk into the SWEETBAY RIDGE subdivision (with funding yet to be determined). <br />This matter was subsequently ratified by the City Council at their first meeting in April, and advanced through the <br />bidding process. <br />On September 13, 2011 the City Council approved a revised scope for this project, which went from an edge mill <br />and overlay to a full depth reclamation. There were slightly higher costs estimated with this revised approach but <br />the end product was determined to be better, and the City will also be receiving excess class 5 product from the job <br />that can be used on other public works projects throughout the City. Bids were received and a contract awarded on <br />September 27th. During the preconstruction meeting it was discovered that a bid item in the specifications <br />(subgrade preparation) was inadvertently left out of the bid form sheet, therefore a pay item was not included in the <br />original bid from all contractors. None of the contractors bidding on the project brought this to staffs attention <br />during the bidding process. The only way this item would change the outcome of the contractor chosen would be if <br />the second low bidder would perform this work at a slight deduct to their original bid. <br />Notification: <br />Observations: <br />Staff has reviewed previous projects for costs associated with similar work to perform the required subgrade <br />preparation, and has negotiated a price of $300 per roadway station. This would equate to a change order of <br />$12,000 and increase the contract amount from $363,222.71 to 375,222.71. <br />Funding Source: <br />Funding for this project is from the City's MSA account. <br />Staff Recommendation: <br />Staff recommends approval of this change order for subgrade preparation in the amount of $12,000. <br />Committee Action: <br />Motion to authorize the proposed change order for subgrade preparation in the amount of $12,000. <br />Specification Excerpt <br />Bid Form <br />Attachments <br />Form Review <br />
The URL can be used to link to this page
Your browser does not support the video tag.