My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 10/18/2011
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2011
>
Agenda - Public Works Committee - 10/18/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:18:29 AM
Creation date
11/3/2011 8:37:54 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
10/18/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
20. Basis of Payment <br />Payment shall be made for the work on the basis specified below. The cost of any additional <br />labor materials, tool and supplies which have not been specifically identified in this section <br />for payment, but required to complete the project as per the plans and specifications shall be <br />considered incidental to the project. <br />1. Mobilization — Payment shall be made on a lump sum basis for the mobilization of <br />equipment. <br />2. Remove Concrete Curb and Gutter — Payment will be made on a per lineal foot basis as <br />compensation for all equipment, material, and labor costs required for the removal and <br />disposal of concrete curb and gutter.. <br />3. Remove Concrete Storm Sewer — Payment will be made on a per lineal foot basis as <br />compensation for all equipment, material, and labor costs required for the removal and <br />disposal of concrete storm sewer pipe. <br />4. Remove Bituminous Pavement — Payment will be made on a per square yard basis as <br />compensation for all equipment, material, and labor costs required for the removal and <br />disposal of bituminous pavement. <br />5. Remove Concrete Pavement — Payment will be made on a per square feet basis as <br />compensation for all equipment, material, and labor costs required for the removal and <br />disposal of concrete pavement. <br />6. Remove Storm Manhole — Payment will be made on a per each basis as compensation for <br />all equipment, material, and labor costs required for the removal and disposal of the <br />storm sewer structures. <br />7. Saw cutting Pavement — Payment will be made on a per lineal foot basis as compensation <br />for all equipment, material, and labor costs required to saw cut pavement per class of <br />material as marked in the field. <br />8. Select Topsoil Borrow — Payment will be made on a per cubic yard basis as compensation <br />for all equipment, material, and labor costs required to furnish and install topsoil meeting <br />the MNDOT 3877 Topsoil Borrow specification on all disturbed areas. <br />9. Salvage Aggregate and Export Excess — Payment will be made on a per cubic yard basis <br />as compensation for all equipment, material, and labor costs required to export excess <br />aggregate material to City Public Works Facility. <br />10. Subgrade Preparation - Payment will be made on a per road station basis as <br />compensation for all equipment, material, and labor costs required to shape and compact <br />subgrade to prior top placement of bituminous surfacing. <br />11. Furnish and Install Class 5 Aggregate Base — Payment will be made on a per ton basis as <br />compensation for all equipment, material, and labor costs required for the transportation, <br />placement, and compaction of the Class 5 aggregate base meeting the Ramsey gradation <br />requirements. Thickness shall be per plan for each designated area. <br />12. Reclaim Bituminous Surface — Payment will be made on a per square yard basis as <br />compensation for all equipment, material, and labor costs required for full depth milling <br />of existing bituminous surface and underlying aggregate. <br />SP 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.