My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 10/18/2011
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2011
>
Agenda - Public Works Committee - 10/18/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:18:29 AM
Creation date
11/3/2011 8:37:54 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
10/18/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Committee 5. 6. <br />Meeting Date: 10/18/2011 <br />By: Len Linton, Engineering/Public Works <br />Title: <br />Consider Guard Rail Enhancements for the Parking Ramp <br />Background: <br />The parking ramp has been open for several years. The exterior railings for all floors were designed to be <br />functional and also appear as architectural elements. The north, east and south railings on the top floor are a <br />mixture of concrete and concrete topped with metal fence. The top of the metal fence is 9 feet above the floor with <br />the top of the concrete at the fence 66 inches above the floor. The lower concrete rails are 43 inches high. <br />The railing on the north, east and south sides of the 2nd and 3rd floors are concrete to 30 inches with metal railings <br />on top making the total height 43 inches. The west railings on all floors are cables to allow for the expansion that is <br />under construction. There are Plexiglas panels in metal frames that stretch from railing to ceiling in the north east <br />corner of the ramp adjacent to the stairs. <br />The interior edges of the floors and ramps between floors have chain link fence over cables cast into the support <br />columns. The top of the chain link fence is 43 inches above the floor. There is an 18" gap between the horizontal <br />fence at the edge of the floor and the sloping fence at the edge of the ramps. <br />The heights of the railings and fences meet the current safety standards. <br />The parking ramp expansion is currently under construction. <br />Notification: <br />Observations: <br />A concern was raised that the lower height railings may not prevent a bicycle rider striking the barrier from going <br />over the top of the railing. A proposal was requested from LSA Design, Inc. for designing changes to three <br />specific areas on the ramp: <br />Enclose all exterior openings on floors 2 and 3 and raise the guard rail height at specific locations on the top floor. <br />Enclose openings between the floors at sloped ramp on all floors. <br />Provide sunscreen protection on east side of parking ramp at middle bay. <br />A proposal was submitted with 2 options: <br />1. Design all enhancements. Fee $5,500 plus reimbursable expenses <br />2. Design limited enhancements. Fee $3,900 plus reimbursable expenses. <br />The work would be processed as a change order to the current construction project and is estimated between <br />$100,000 and $200,000 depending on the level of improvements selected. <br />Funding Source: <br />To be determined <br />Staff Recommendation: <br />Based on discussion. <br />Committee Action: <br />Based on discussion. <br />
The URL can be used to link to this page
Your browser does not support the video tag.