My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 10/18/2011
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2011
>
Agenda - Public Works Committee - 10/18/2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:18:29 AM
Creation date
11/3/2011 8:37:54 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
10/18/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I\I D F 0 R M <br />From Site to Finish <br />105 South Fifth Avenue Tel: 612-252-9070 <br />Suite 513 Fax: 612-252-9077 <br />Minneapolis, MN 55401 www, landform. net <br />10/4311 <br />5220 156th Lane NW <br />Ramsey,Mn, <br />Thank you for asking us to provide a septic design for your project in Ramsey. We have successfully <br />completed projects of similar nature in the past and have the expertise to meet and exceed your <br />expectations for this project. <br />We have estimated/designed a new, standard septic system (Type 1) for a 4-bedroom house. The <br />details of this system are outlined within the project scope as follows. <br />• Design is to replace flooded trenches in rear lower yard. <br />Existing system is non compliant due to lack of vertical separation. <br />• Pump and reuse existing compliant 1250 gallon septic tank.. <br />• Install 1500 gallon reverse flow tank use 1000 gallon end for lift tank with pump and indoor <br />alarm. Install in lower west end of yard below pool elevation. This may require a water proofed <br />tank and dewatering. <br />• Use dropbox distribution of effluent. Pump to highest dropbox. <br />• Use schedule 40 piping throughout pressure distribution system. <br />Verify all well and property line setbacks. <br />• As part of the scope of this project and to ensure quality control, we will divert water from <br />system's surroundings on final grade, rope off the new septic site, keep all construction traffic <br />off of the site before and after construction. <br />Sincerely, <br />Landform <br />Michael Jungbauer, The Septic Doctor �_ <br />MPCA License No. L3227 <br />Lendfono9', Sensibly "' and Site to Ftnlsh" are saMco marks of Landform Englnoartng Company. <br />
The URL can be used to link to this page
Your browser does not support the video tag.