My WebLink
|
Help
|
About
|
Sign Out
Home
11/07/11
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Housing & Redevelopment Authority
>
Agendas
>
2010's
>
2011
>
11/07/11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2025 11:06:31 AM
Creation date
11/4/2011 1:16:58 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Housing & Redevelopment Authority
Document Date
11/07/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
anteagroup <br />Antea USA, Inc. <br />5910 Rice Creek Parkway, Suite 100 <br />Shoreview, Minnesota 55126 USA <br />www.anteagroup.com <br />WETLAND SERVICES PROPOSAL: <br />WETLAND DELINEATION, PERMIT APPLICATION, AND MITIGATION PLAN <br />CLIENT: City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey, MN 55303 <br />PROJECT: Bid Assistance for Wetland Mitigation Planting, and Wetland Mitigation Monitoring for the COR <br />Wetland Mitigation Sites, Ramsey, MN <br />DATE: October 17, 2011 <br />OBJECTIVE: <br />To perform wetland delineation and permitting service for the proposed retail development site located south of <br />Bunker Lake Boulevard, east of Armstrong Boulevard, at the COR site in the City of Ramsey. The site includes an <br />existing wetland, as well as an old wetland mitigation area that was constructed in the 1990's. <br />SCOPE of SERVICES: <br />Antea Group will provide wetland consulting services for the project and objective referenced above. Antea Group <br />will proceed with the following work plan designed to accomplish this work. <br />PROPOSED WORK PLAN: <br />1). Wetland Determination: Perform a wetland determination during the fall of 2011 prior to snow cover. The <br />determination will identify the boundaries of the jurisdictional wetland for planning purposes, and will generate a <br />CAD file to be incorporated into the site plan. <br />2). Pre -Application TEP Meeting: Once a site plan has been developed to a level where potential wetland impacts <br />can be quantified, a meeting with the Technical Evaluation Panel (TEP) will be arranged. The meeting agenda will <br />include discussion regarding the proposed development plan for the site, and likely wetland impacts. While the <br />TEP has previously indicated verbally they would favor the proposed development and impacts, this subject should <br />be revisited to ensure regulatory support. It is assumed that one meeting, plus time to prepare documents, a <br />preliminary sequencing analysis, and exhibits for the meeting will be needed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.