3.8 The submission of a Bid will constitute an incontrovertible representation by BIDDER that <br />BIDDER has complied with every requirement of this Article 3, that without exception the Bid is <br />premised upon performing and furnishing the Work required by the Contract Documents and such <br />means, methods, techniques, sequences or procedures of construction as may be indicated in or <br />required by the Contract Documents, and that the Contract Documents are sufficient in scope and <br />detail to indicate and convey understanding of all terms and conditions for performance and <br />furnishing of the Work. <br />4. INTERPRETATIONS AND ADDENDA <br />4.1 All questions about the meaning or intent of the Contract Documents are to be made in writing, <br />and directed to ENGINEER. Interpretations or clarification's considered necessary by <br />ENGINEER in response to such questions will be issued by Addenda mailed or delivered to all <br />parties recorded by ENGINEER as having received the Bidding Documents. Questions received <br />less than ten days prior to the date for opening of Bids may not be answered. Only questions <br />answered by formal written Addenda will be binding. Oral and other interpretations or <br />clarifications will be without legal effect. <br />4.2 Addenda may also be issued to modify the Bidding Documents as deemed advisable by OWNER <br />or ENGINEER. <br />5. BID SECURITY <br />5.1 Each Bid must be accompanied by Bid security made payable to OWNER in an amount of five <br />percent of the BIDDER'S maximum Bid price and in the form of a certified or bank check or a Bid <br />Bond (on form attached, if a form is prescribed) issued by a surety meeting the requirements of <br />Paragraph 5.1 of the General Conditions. <br />5.2 The Bid security of the Successful BIDDER will be retained until such BIDDER has executed the <br />Agreement and furnished the required contract security, whereupon the Bid security will be <br />returned. If the Successful BIDDER fails to execute and deliver the Agreement and furnishes the <br />required contract security within fifteen days after the Notice of Award, OWNER may annul the <br />Notice of Award and the Bid security of that BIDDER will be forfeited. The Bid security of the <br />three lowest BIDDERS may be retained by the OWNER until the Agreement is signed and <br />submitted with the bonds as set forth in Paragraph 2 of the Bid Form. Bid security of other <br />BIDDERS will be returned within seven days after award of the contract. <br />6. CONTRACT TIME <br />The number of days within which, or the dates by which, the Work is to be completed and ready for final <br />payment (the Contract Time) are set forth in the Bid Form and the Agreement. <br />7. LIQUIDATED DAMAGES <br />Provisions for liquidated damages are set forth in the Agreement. <br />8. SUBSTITUTE OR "OR- EQUAL" ITEMS <br />The Contract, if awarded, will be on the basis of materials and equipment described in the Drawings or <br />specified in the Specifications without consideration of possible substitute or "or- equal" items. Whenever <br />it is indicated in the Drawings or specified in the Specifications that a substitute or "or- equal" item of <br />material or equipment may be furnished or used by CONTRACTOR if acceptable to ENGINEER, <br />application for such acceptance will not be considered by ENGINEER until after the Effective Date of the <br />Agreement. <br />I -2 <br />