PART 1 GENERAL <br />1.01 SUMMARY <br />A. Section Includes: <br />1. Preparatory work and operations. <br />2. Movement of personnel, equipment, supplies and incidentals to the project site. <br />3. Establishment of CONTRACTOR offices and facilities. <br />B. Basis of Payment: <br />1. The lump sum bid amount shall not exceed 5% of the total Bid amount. <br />2. Mobilization includes providing documentation for total amount of material removed, <br />preparing necessary schedules and coordination with ENGINEER. CONTRACTOR <br />responsible for obtaining all necessary permits. <br />3. A total of 12 soils samples must be provided. CONTRACTOR to coordinate with <br />ENGINEER. <br />4. Payment for Mobilization will be based on the following schedule item: <br />Item Unit <br />Mobilization L.S. <br />5. Progress payment amounts for mobilization will be determined by the percentage <br />of the total contract completed based on the following schedule <br />% of Contract Completed <br />25 <br />65 <br />80 <br />100 <br />SECTION 01505 <br />MOBILIZATION <br />(MN /DOT 2021) <br />1.02 REFERENCES <br />A. MN/DOT 2021. <br />1.03 PERFORMANCE REQUIREMENTS <br />A. Submittal of information listed under 1.04. <br />B. Commencement of work. <br />C. Final cleanup of site. <br />% of Item Paid <br />30 <br />50 <br />80 <br />100 <br />