Laserfiche WebLink
PART 2 PRODUCTS <br />2.01 EQUIPMENT <br />A. Regenerative sweeping equipment includes: <br />1. Elgin Crosswind <br />2. Johnson Cyclone <br />3. Schwarze Models 7000, 8000 and 9000 <br />4. Tymco — 110 horsepower or greater, Model 600 <br />5. Approved equal by ENGINEER <br />B. Pickup Broom Sweeping equipment includes: <br />1. Elgin Pelican <br />2. Schwarze M -Series <br />3. Allinza MX Series <br />4. Approved equal by ENGINEER <br />PART 3 EXECUTION <br />3.01 GENERAL REQUIREMENTS <br />A. Only city streets shall be swept. County and state roads, or private driveways are not to be swept. <br />See Appendix A for location map of streets and parking lots to be swept. <br />B. Water is available at the City of Ramsey Public Works located at 14100 Jaspar. Connection to <br />City hydrants is not allowed. <br />3.02 SCHEDULE <br />A. First sweep of city streets shall begin XXX calendar days after the award of the contract. <br />B. Once a sweep has started, CONTRACTOR must complete the sweeps within 21 calendar days. <br />C. CONTRACTOR to submit an estimated schedule to ENGINEER a minimum of 48 hours prior to <br />beginning each sweep. <br />END OF SECTION <br />04314 -2 <br />