|
Category
<br />Water Utility Improvement
<br />WM Looping: Alpine Dr. (CSAH 5 to Krypton St.) 04 -WTR -001 6 100,000 100,000
<br />Renovate Pump House 2 04 -WTR -004 5 49,000 49,000
<br />Complete Pump House 3 04 -WTR -005 6 60,000 60,000
<br />The COR Bunker Lake Blvd (Armstrong - Ramsey Blvd) 04 -WTR -009 6 225,000 225,000
<br />Water Treatment Plant Construction 04 -WTR -017 6 9,700,000 8,700,000 18,400,000
<br />Watermain Looping: (Ramsey Blvd to Armstrong Blvd) 04 -WTR -018 6 273,000 273,000
<br />1.5 MG Ground Storage Reservoir 05 -WTR -004 6 2,000,000 2,000,000
<br />Well Rehabilitation & Pump Replacement 07 -WTR -001 6 50,000 58,000 30,000 32,000 170,000
<br />River Pines Lift Station Water Connection 08 -WTR -003 6 20,000 20,000
<br />Well House [Improvements 09 -WTR -001 6 30,000 30,000
<br />Magnesium Street Watermain Looping 11 -WTR -002 6 120,000 120,000
<br />Fire Station #1 Extension of Water 11 -WTR -003 6 25,000 25,000
<br />Watermain Sunfish Lk Blvd 12 -WTR -001 6 350,000 350,000
<br />Revised 10/2011
<br />Water Utility Improvement Total 450,000 2,331,000 9,850,000 8,732,000 459,000 21,822,000
<br />GRAND TOTAL
<br />City of Ramsey, Minnesota
<br />Capital Improvement Program
<br />2012 thru 2016
<br />PROJECTS BY CATEGORY
<br />Includes Future Projects
<br />Project# Priority 2012 2013 2014 2015 2016 Total
<br />450,000 2,331,000 9,850,000 8,732,000 459,000 21,822,000
<br />PAGE 285
<br />
|