Laserfiche WebLink
Review Process Flowchart <br />mr2iwzir3 <br />BE I SCHEDULE <br />INFORMED r INFORMAL <br />Introduce MEETING <br />yourself to You meet with <br />how our Development <br />development Review Com- <br />review works. mittee (DRC) <br />staff from <br />GOAL: Make various depart - <br />sure your ments to review <br />develop- your proposal. Within 15 working days, staff <br />meat idea is They iden- determines completeness. ff <br />feasible lily what you complete, staff provides a lerda- <br />need to make live review schedule in writing. If <br />a complete incomplete, staff identifies specific <br />application hems required to make the ap- <br />and discuss citation omelete_ <br />be anticipated <br />timeline_ Dependent on speahc circum- <br />stances, you may wish to sched- <br />ule a neghboahood meeting at <br />this point <br />SUBMIT <br />APPLICATION <br />You submit a formal application <br />with be information, plans and <br />fees identified in the appropri- <br />ate city checklisl(n). Your plans <br />are reviewed by DRC staff and <br />outride agencies. if required. <br />Development Review Manual (September 2011) <br />Review Flowchart <br />Page 6 of 45 <br />STAFF <br />REVIEW <br />Once an application is <br />complete, DRC staff meets to <br />discuss their comments. <br />Applicants with larger projects <br />are encouraged to schedule a <br />face -to -face meeting to receive <br />DRC comments. <br />You revise your plans to ad- <br />dress DRC comments. The <br />extent of revisions varies, <br />depending an the nature of the <br />required revisions <br />The first staff review typically <br />takes 10-12 working days. <br />Subsequent reviews may <br />take less tare. <br />Planning staff coordinates <br />comments barn all departments <br />into a single report. <br />415 _ ' 7 7 <br />PLANNING CITY <br />COMMISSION COUNCIL <br />REVIEW REVIEW <br />The Planning Staff prepares <br />Commission holds a report with a <br />a public meeting recommended mo- <br />or hearing on your bon, a summary of <br />epplicahof. de pert- the Planning Com- <br />dent on the type of mission meeting, <br />application and a copy of the <br />Planning Commis - <br />The Commission sign staff report <br />typically recom- and minutes. <br />mends approval <br />with conditions or If a develop- <br />denial with findngs meal cifintract m <br />and moves the ap- required, staff pre - <br />plication forward to panes the contract <br />th Gay Cal and you submit <br />an executed copy <br />prior to the City <br />Council meeting. <br />SUBMIT <br />PERMIT <br />APPLICATION <br />You submit a <br />Formal application <br />with all plans and <br />supporting doer <br />ments identified <br />In the appropriate <br />city cheeldist <br />POST APPROVAL <br />Assuming a positive outcome. you <br />receive a letter from fhe cry with a copy <br />of the approving resolution attached. <br />For larger projects, staff contacts you to <br />net up a meeting with your entire team <br />to review what you need to provide be- <br />fore the city will issue a building permit. <br />PLAN REVIEW <br />For new one and two tardy home <br />construction, review takes a maximum <br />of 5 business days upon recut of <br />a complete application and support- <br />ing documents. Up to 5 additional <br />days maybe needed to evaluate any <br />revised pans and documents <br />For commemiadindusfinatimultafondly <br />construction (new and additions), re- <br />view takes a maximum of 19 business <br />days upon receipt of a complete ep- <br />pteetion and supporting documents. <br />With input from various city depart- <br />ments, Butdmg staff provides a letter <br />detailing any plan deficiencies. Up <br />to 10 additional days may be needed <br />once revised plans and documents <br />are submitted. <br />OBTAIN <br />BUILDING <br />PERMIT <br />When the pennd <br />and plans are <br />ready for is- <br />suance. staff <br />contacts you with <br />be permit fee <br />amount <br />The stamped ap- <br />proved plans and <br />inspection record <br />card must be kept <br />on Melds site <br />until all inspection <br />approvals are <br />made. <br />OTHER <br />PERMITS <br />In addition to <br />the butting <br />permit, ycu <br />will need to <br />cbtafn permits <br />for sewer/wa- <br />ter, plumbing, <br />mechanical <br />and electrical <br />systems, fire <br />sprinkler and <br />alarm sys- <br />tems and sign <br />instalation. <br />J <br />SCHEDULE <br />INSPECTIONS <br />You must <br />contact Me <br />Budding Divi- <br />sion to arrange <br />for required <br />inspections. <br />inspection <br />requests for <br />specific times <br />will be honored <br />whenever <br />possbte- N She <br />requested lime <br />is not available, <br />the customer <br />will be advised <br />00 that an alter- <br />nate time or the <br />neat business <br />day can be <br />selected_ <br />8 I910 ' 11 <br />RECEIVE <br />CERTIFICATE OF <br />OCCUPANCY <br />Once all work <br />is completed <br />and all required <br />final inspections <br />approved, upon <br />request, the Budd- <br />ing Division is- <br />sues a certificate <br />of occupancy <br />